Orange County NC Website
R09SON Qe WOESE INC. <br />Mr. David E. Canndl <br />June 1Z, Z000 <br />Page Y <br />RFiNR lI067 Elrctrical S Mechankal Engineering Services <br />Carnty of OrarrSe <br />R3W t+lo. X0043 <br />DELIVERABLES <br />• Life Cycle Report with recantrnendations and Probable ConsWdion Budgets (3 espies) <br />A single packagt! Construction Document consisting of the following far Richard E. Whined Numan <br />Resource Building, Centrnl Recreation Building Replak~ment of WVAC System, The Northam Center New <br />HVAC System b Court Street Annex Building Elech'ical Design Senrhs: <br />• SdrematkJDegign Development design . <br />• Tum-key laid package infamalion including: <br />• Ab trout-end doaarrerrts, such as General Conditions, Supgemental General Corrditiorrs, Bonding <br />requirements, eta conforming to Orange County requirements <br />We wiB assist your office in Negotiation of Bids if required. <br />OUT OF SCOPE SERVICES <br />Our fee is based on the above listed Projed Desaiptiarr and Scope of Services. Not included are arty <br />beyond those stated above, including but limited to, the following: <br />• Systems and equipment testing <br />Printing of documents for bid. distttbution to the oontradors and pemrit purposes <br />• Elecdlcal metering and testing <br />Indoor air qualky monkoring and testing <br />• Wortc associated with hazardous materials. Survey, identification and management of design for <br />removal of hazardous materials <br />• Any code compliance requirements other than the codes assodated with the new NVAC system <br />On-site day-today won obsetvaiion beyond that noted in Scope of Services <br />• Systems Corntrrissionirrg <br />r permitting. <br />PRt]JECT SCHEDULE <br />We are prepared to begin wortk upon receipt of your written authorization and. acceptance of our proposal. <br />We arrtidpate completing our wok in accordance with the agreed sctredule with your oifioe and Robson S <br />Woese, Ina The tentative schedrde below would begin upon our ~Pt of the Notice to Proceed. <br />Draft Life Cycle Study Repot Week a <br />ReWew of Repoli Week 11 <br />Final Report Week 14 <br />