Browse
Search
Agenda - 06-29-2000-8n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 06-29-2000
>
Agenda - 06-29-2000-8n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:50:45 PM
Creation date
8/29/2008 11:19:24 AM
Metadata
Fields
Template:
BOCC
Date
6/29/2000
Document Type
Agenda
Agenda Item
8n
Document Relationships
2000 NS IT - Contract for County Web Site Redesign
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 06-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STS <br />N. c. nepanmenr ar comfne~ee <br />office of Intwmabon iecnna/pgy SelWCes <br />~a <br />Category Risk Mitigation Strategy <br />Technical ^ Failure to close critical technology, ^ Identify standards and design / <br /> function, standards, and information gaps develop system architecture based <br /> ^ <br />Backward browser compatibility beyond on approved standards <br /> version 4.51 Netscape and 4.0 IE will ^ Identify and obtain buy-in on <br /> prevent use of DHTML in overall design of functional and business <br /> site. requirements <br /> ^ Hire skilled and experienced contract <br /> personnel as needed <br /> ^ Develop plan and manage <br /> knowledge transfer <br /> • Provide links to download newer <br /> versions of browers <br />operational ^ Failure to properly assess OCIS ' Review processes to optimize <br /> information systems to determine the resources and identify functions to <br /> required level and method of integration be included in enhancement <br /> ^ Develop a detailed design <br /> specification that includes a detailed <br /> data model and maps all required <br /> data intertaces <br />~rganizationa! ^ Failure to obtain organizational /agency ^ Establish consensus among agency <br /> buy-in senior management <br /> • Develop effective communication <br /> plans <br />13. Technologies Employed and/or Application Architecture <br />The technical architecture, as mandated by IRMC, must accommodate rapid rates of change in both <br />business and technical environments. The proposed web design should support standard browsers as <br />the interface for the user. In addition, standard developmental tools for accessing and updating the <br />site(s) must be defined. <br />The site architectural requirements should effectively address the site life cycle. This includes navigation, <br />data submission and acquisition, and authentication. Specifically, the site must also include the <br />architecture to support shared or common applications; GroupWise communications tools, and secure <br />transactions. <br />Lastly, the architecture should include the necessary components to effectively manage the site long <br />term. This includes technical support, operation and storage management, performance monitoring and <br />tuning, security services, and disaster recovery. Reference the IRM Technical Architecture Standards <br />website far the detailed technical architecture requirements. <br />PC516V4.DOC - OC Internet FINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.