Browse
Search
Agenda - 06-06-2000-8n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 06-06-2000
>
Agenda - 06-06-2000-8n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:22:26 PM
Creation date
8/29/2008 11:18:55 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2000
Document Type
Agenda
Agenda Item
8n
Document Relationships
Minutes - 06-06-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-047 Resolution approving Fox Hill Farm East Phase 2, Sections A and B Preliminary Plat
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OR <br />A letter of credit, escrow agreement, or bond shall be submitted to secure <br />construction of Country Air Lane, Butterly Place, Fernleaf Place, Rosebriar <br />Place and Highbranch Way to the standards of the North Carolina Department <br />of Transportation. An estimate of the construction cost must be prepared by a <br />certified/licensed engineer or grading contractor and submitted to the Planning <br />and Inspections Department. The financial guarantee must reflect 110 % of that <br />estimate and be issued by an accredited financial institution licensed to do <br />business in North Carolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guarantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. All lots shall receive access from the internal subdivision roads. No driveways <br />shall be permitted within S0~ of a street intersection. <br />3: An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division for review and <br />approval. <br />4. Approved street name signs shall be erected at the intersection as required in <br />Section IV-B-3-c-12 of the Orange County Subdivision Regulations. Evidence <br />shall be submitted by the applicant that the sign is in place or a copy of the <br />receipt for purchase of the signs shall be submitted to the Planning Department. <br />5. Prior to any construction or alteration of any existing access within the right-of- <br />way of New Sharon Church Road, the developer/owner shall secure a driveway <br />permit from the NCDOT District Office. Submit a copy of the NCDOT- <br />approved permit and letter to the Planning Department at the same time as the <br />request for Planning Department signatures on the Final Plat. <br />6. Sight triangles (10~ x 70~~ shall be shown on the Final Plat at each intersection. <br />7. Aright turn taper lane on New Sharon Church Road at the Country Air Lane <br />intersection shall be constructed or bonded to NCDOT standards prior to <br />Planning Department signatures on Final Plat far Phase 2 Section A. A traffic <br />impact study will be conducted, prior to approval. of Phase 2 Section B, by the <br />developer to determine the need for a center left turn lane. <br />G Land Use Buffers and Landscaping <br />Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. Landscaping shall be placed behind the sight triangles <br />at intersections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.