Browse
Search
Agenda - 05-22-2000-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-22-2000
>
Agenda - 05-22-2000-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:28:04 PM
Creation date
8/29/2008 11:18:39 AM
Metadata
Fields
Template:
BOCC
Date
5/22/2000
Document Type
Agenda
Document Relationships
Minutes - 05-22-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-037 Zoning Ordinance Text Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
ORD-2000-038 Soil Erosion and Sedimentation Control Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />~.. PUBLIC HEARING NOTIFICATION PROCESS <br />Existing Conditions, <br />• One method of public heaiing notification in ordinance <br />Proposed Ordinance <br />• Provides a second option as approved in State Statutes to include an `Open House' phase with staff prior to <br />public hearing for County proposed amendments <br />• Clarifies the procedures for notification <br />2. APPLICATION CRITERIA FOR EXISTING COMMERCIAL-V (EC-5) DISTRICTS <br />Existin Conditions <br />• Rigid procedure for modification of property condemned for a public process <br />Proposed Ordinance <br />• Proposes procedures, and strict conditions, far modification of EC-5 Districts <br />3. ORANGE COUNTY SOIL EROSION AND SEDIMENTATION CONTROL AMENDMENTS <br />Existin Conditions <br />• Ordinance contains lesser enforcement actions and restorations requirements <br />Proposed Ordinance <br />• Increased per day civil penalties <br />• Change in starting day of civil penalties <br />• Requires restoration in cases where off site damage has occurred. <br />4. CONSIDERATION OF NEUSE RIVER BASIN STORMWATER CONTROL ORDINANCE <br />Existing Conditions <br />• No ordinance in effect other than the locally adopted watershed rules <br />Proposed Ordinance <br />• Stormwater regulations for new developments <br />• Buffers for all USGS blue line streams and mapped Soil Survey streams <br />• Illegal dischazge tracking by County <br />• Retrofit Locations <br />• Annual Public Education <br />• Reporting Requirements <br />Development Process, Schedule, and Action <br />• Public Hearing on May 22, 2000 <br />• Refer amendment 1 to the Planning Board for a recommendation back to the Boazd of County <br />Commissioners no sooner than June 29, 2000. <br />• Refer amendments 2, 3 and 4 to Planning Boazd for a recommendation back to the Board of County <br />n • .l A . 1 ~ AAAA <br />
The URL can be used to link to this page
Your browser does not support the video tag.