Browse
Search
Agenda - 05-22-2000-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-22-2000
>
Agenda - 05-22-2000-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:28:04 PM
Creation date
8/29/2008 11:18:39 AM
Metadata
Fields
Template:
BOCC
Date
5/22/2000
Document Type
Agenda
Document Relationships
Minutes - 05-22-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-037 Zoning Ordinance Text Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
ORD-2000-038 Soil Erosion and Sedimentation Control Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />C. Review and Response to Plans <br />The Erosion Control Officor will review each complete plan submitted and within 30 days of receipt <br />thereof will notify the person submitting the plan that it has been approved, approved with modifications, <br />approved with conditions, approved with performance reservations, or disapproved. Examples of <br />conditions of approval are, but not limited to: channel stabilization must be successful or another type of <br />lining must be used; delineating certain areas to be graded and stabilized within a specified number of <br />days to reduce the potential for erosion and protect critical areas; providing a performance security to <br />• provide permanent ground cover; and requiring the person financially responsible to retain the services <br />of a professional engineer or architect to supervise implementation of the approved erasion control plan. <br />Deadline for Reviewing Plan <br />,Failure to approve, approve with_conditons. approve with modifications or disapprove a complete <br />erosion and sedimentation control plan within 30 days of receipt of the complete plan shall be deemed <br />approval. Disapproval l~e~ial of a plan must specifically state in writing the reasons for disc royal <br />denial. The County must approve a rove with conditions a rove with modifications or dex3~ <br />dis. annrove a revised plan within 1 S days of receipt, or it is deemed to be approved. If, folloWing <br />commencement of eland-disturbing activity pursuant to an approved plan, the County determines that <br />the plan is inadequate to meet the requirements of this Ordinance, the County may require °••~'- -°-•'-~~-° <br />any revision of the,_plan es-a~e that is necessary to comply with this Ordinance. Failure to approve. <br />a rove with conditions a rave with modifications or disc rove a revised erosion control Ian within <br />1 S da s of recei t shall be deemed a royal of the Ian. <br />G. Review of Other Environmental Documents <br />Any plan submitted for eland-disturbing activity for which an environmental document (either an <br />assessment or impact statement) is required by the North Carolina Environmental Policy Act (G.S. <br />113A-1, et seq.) shall be deemed incomplete until a complete environmental document is available far <br />review. The County shall promptly notify the person submitting the plan that the 30 day time limit for <br />review of the plan pursuant to Section 18(C) of this Ordinance shall not begin until a complete <br />environmental document is available for review. <br />The a royal of the erosion control Ian is conditioned on the a licant's com liance with Federal and <br />State Water uali laws re ulations and rules. <br />H. Consideration of Applicants Past Performance <br />Oran a Coun ma disa rove ~ Erosion Control Plan u~1~~~Q;;od upon a finding that an <br />applicant, : or a parent, subsidiary. <br />or other affiliate of the applicant: <br />2. has failed to pay a civil penalty assessed pursuant to the Act or a local ordinance adopted <br />pursuant to the Act ; by the time the payment is <br />due. . <br />Commentary: The changes above will be made in this Section to conform to amendments to the <br />Model Ordinance. <br />Section 21 Inspections and Investigations <br />A. Site Inspections <br />...,.,__ ri ,~......-- --~ - ----- - . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.