Browse
Search
Agenda - 05-22-2000-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-22-2000
>
Agenda - 05-22-2000-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 8:28:04 PM
Creation date
8/29/2008 11:18:39 AM
Metadata
Fields
Template:
BOCC
Date
5/22/2000
Document Type
Agenda
Document Relationships
Minutes - 05-22-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
ORD-2000-037 Zoning Ordinance Text Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
ORD-2000-038 Soil Erosion and Sedimentation Control Amendments
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
re wired under the Minin Act of 1971 Article 7 of Cha ter 74 of the General statues, <br />Commentary: The changes.abave will be made in this Section to conform to amendments to the <br />MadelOrdinance. <br />Section 17 Permits <br />C. 6~a~g Land- Disturbin Permit <br />Before starting gland- disturbing activity greater than 20,000 square feet, the owner or his agent shall <br />obtain a ~g Land- Disturbing Permit from the Erosion Control Officer, Brosion Control Plans must <br />be approved before a ~g Land- Disturbing Permit will be issued: 6~g Land-_Disturbing Permits <br />maybe obtained when the Flan is approved or prior to the start of the land disturbance. <br />Commentary: This text change will occur throughout the Ordinance. The purpose of this change is to <br />clam that the Permit is to be obtained before any land-disturbing activity. <br />D. Expiration of Permits <br />Plan Approvals <br />The Coun ma establish an ex iration date for erosion control laps a roved under this Ordinance. <br />Erosion Control Plan Approvals expire ei hteen months eye-}~e~x after the approval date unless the land <br />disturbance is started as defined below. <br />Commentary: The text will be added to conform to the Model. Stajf'is proposing that the time <br />period of expiration be extended to give reasonable time for applicant to obtain all approvals <br />and permits necessary to construct the project, which can take considerable time in Carrboro <br />and Chapel Hill. A year is not Zang enough. <br />Section 18 Erosion and Sedimentation Control Plans <br />A. Plan Requirement <br />An Erosion Control. Plan shall be prepared for all land-disturbing activities subject to this Ordinance <br />whenever the proposed activity is to be undertaken on a tract comprising more than 20,000 square feet, if <br />more than 20,000 square feet are to be uncovered, Three (3) copies of the Plan shall be filed with the ' <br />Erosion Control Officer, one copy of which will be simultaneously forwarded to the Orange Soil and <br />Water Conservation District, at least 30 days prior to the commencement of the proposed activity. <br />One co of the Plan must be Forwarded to the Director of the NC Division of Water uali for an <br />land-disturbin activi that involves the utilization of ditches for the u ose of de-waterin or lowerin <br />the water table. <br />B. Review by the Soil & Water Conservation District <br />The Orange Soil and Water Conservation District, ~}~;.L~n a.,.,~ ~~-e,.e:.,+ ~~ °~-. ~,°~ .,:~w;,.s„~~, <br />~" <br />shall review <br />such plan and submit ~ a~ comments and recomrendations to the Erosion Control Officer within 20 <br />days after the Soil and Water Conservation District received the erosion control elan. or within any <br />15 <br />shorter eriod of time as ma be a eed u an b the District and the Coun .Failure of the District to <br />submit its comments and recommendations to the Erosion Control Officer within wed 20 days <br />or an a reed-u on shorter eriod of time shall not delay final action on the plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.