Orange County NC Website
Total Construction -Costs by Alternative <br /> Total Minimum <br /> Phase I Operable North <br />Alternative Cost Segment Raleigh Duke <br />A <br />(Baseline) $408 M $306 M $84 M $18 M <br />B1 <br />(One-Track) $467 M $350 M $99 M $18 M <br />B2 <br />(Two-track) $597 M $451 M $127 M $19 M <br />C <br />(NCDOT Rail) $619 M $441 M $159 M $19 M <br />