Orange County NC Website
TTA / NCDOT Approach <br />TTA <br />NCDOT <br />• Space for new freight 1 inter- <br />city passenger track <br />• Primarily 25ft track centers <br />• Minimum cost and impacts <br />• Minimum disruption of <br />existing tracks <br />• Passenger train speeds to 65 <br />mph <br />• Relocates 3.9 miles of <br />existing tracks <br />• Space for new freight 1 inter- <br />citypassenger track <br />• 2 5 ft track centers <br />• Least cost for new high speed <br />and freight tracks <br />• Fix railroad dispatching and <br />control problems <br />• Passenger train speeds up to <br />90 mph <br />• Ultimately relocates 21.75 <br />miles of existing tracks <br />