Orange County NC Website
21 <br />b. If the Board of Commissioners does not accept the report and rejects the petition, it '. <br />shall provide the developer with instructions to correct any deficiencies and all steps ~~ <br />necessary for the release of the performance bond or other security. <br />5. Annual Inspection Required <br />Amended <br />1-20-98 a. All stormwater structures shall be inspected by Orange County at least on an annual 'p <br />basis to determine whether the controls are performing as designed and intended. p <br />Records of inspections shall be maintained on forms approved or supplied by the 'p <br />North Carolina Division of Water Quality. Annual inspections shall begin within , <br />one (1) year of the filing date of the deed for the stormwater control structure. <br />b. In the event the County Engineer discovers the need for corrective action of <br />improvements, he/she shall notify the owning entity of the needed improvements <br />and the date by which the corrective action is to be completed. All improvements <br />shall be made consistent with the plans and specification of the stormwater control i, <br />structure and the operation and maintenance plan or manual. After notification by ~ <br />the owning entity, the County Engineer shall inspect and approve the completed <br />improvements. <br />6.23.5 PLACEMENT OF STREETS, DRIVEWAYS AND BUILDINGS <br />Streets, driveways, and buildings or other structures shall be located, to the extent reasonable possible, so ! <br />as to take full advantage of the absorptive capacity of the soils on which they are to be situated.and to avoid I: <br />the following environmentally sensitive areas: <br />1) Stream buffer zones as required by Article 6.23.7; <br />2) Wetlands as defined by the U.S. Army Corps of Engineers; <br />3) Land with slopes greater than fifteen percent (15%); and <br />4) Natural areas as identified in the Inventory of Natural Areas and Wildlife Habitats of Orange <br />County, NC. -.. - - <br />To avoid creating lots that will be difficult to build upon in compliance with the standards of this Article, <br />the preliminary plan shall show proposed building envelopes and approximate driveway locations for all <br />lots within subdivisions. Thereafter, no zoning compliance permit may be issued for the construction of <br />buildings or driveways outside the areas so designated on the preliminary plan unless the Zoning Officer <br />makes a written finding that the proposed location complies with the provisions of this Article. <br />6.23.6 ITNDISTURB~ AREA <br />Because soils which are seriously disturbed, even if re-vegetated, can generate nearly as much run-off as <br />paved areas, a portion of property being developed within watershed critical areas must remain undisturbed <br />during construction. <br />