Browse
Search
Agenda - 05-03-2000-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-03-2000
>
Agenda - 05-03-2000-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:10:35 AM
Creation date
8/29/2008 11:18:07 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2000
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-03-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zo <br />a. The signed deed, related easements and survey plat for the stormwater control <br />structure ready for filing with the Orange County Register of Deeds; and <br />b. A certification sealed by an engineer or landscape architect (to the extent that the <br />General Statute, Chapter 89A, allow) stating that the detention pond is complete and <br />consistent with'the plans and specifications. <br />2. Submittal of Inspection Report to County Engineer <br />The Erosion Control Supervisor shall present materials submitted by the developer and the <br />inspection report and recommendations to the County Engineer. <br />a. If the County Engineer approves the inspections report and accepts the certification, <br />deed and easements, he/she shall file the deed and easements with the Orange <br />County Register of Deeds, release up to seventy-five (75) percent of the value of the <br />performance bond or other security and issue a Watershed Protection Compliance <br />Permit for the stormwater control structure. <br />b. If deficiencies are found, the County Engineer shall direct that the improvements <br />and inspections be made and/or documents corrected and resubmitted to the County <br />Engineer. <br />3. Watershed Protection Compliance Permit Required Prior to Occupancy <br />No Building Permit or Certificate of Occupancy may be issued in the absence of a valid <br />Watershed Protection Compliance Permit. <br />4. Release of Remaining Security <br />No sooner than one (l) year after the filing date of the deed, easements and maintenance <br />agreement, the developer may petition the Board of Commissioners to release the remaining <br />value of he performance bond or other security. Upon receipt of said petition, the County <br />Engineer shall inspect the stormwater control structure to determine whether the controls <br />aze perfomvng as designed and intended. The County Engineer shall present the petition, <br />inspection report and recommendations to the Board of Commissioners. <br />a. If the Board of Commissioners approves the report and accepts the. petition, the <br />developer shall deposit with Orange County a cash amount equal to that described <br />- in Article 6.23.4a1, after which, the Boazd shall release the performance bond or <br />other security. <br />
The URL can be used to link to this page
Your browser does not support the video tag.