Browse
Search
Agenda - 05-03-2000-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-03-2000
>
Agenda - 05-03-2000-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:10:35 AM
Creation date
8/29/2008 11:18:07 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2000
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-03-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />1. UPPER ENO WATERSHED <br />Exis 'ng.,Conditions <br />• Density: <br />• Critical Area: 1 dwelling unit per two acres <br />• Protected Area: 1 dwelling unit per 40,000 square feet (0.92 acres) <br />• Protected Area (Transition Area): Varies depending on district and public sewer/water <br />Pro o rdinance <br />UPPER ENO WATERSHED <br />• Density: <br />• Critical Area: 1 dwelling unit per 5 acres with five lots on the first 10 acres <br />• Protected Area (Outside Transition Area): 1 dwelling unit-per 5 acres with 5 lots on the first 10 acres <br />• Protected Area (Transition): Varies depending on location within district and public sewer/water <br />availability <br />• 10% lot bonus if open space is greater than 33% and less than SO% <br />• 20% lot bonus if open space exceeds 50% <br />• Cluster: <br />• Minor subdivisions will follow conventional <br />• Major conventional subdivisions (i.e. over 10 acres) require 15% open space <br />• Minimum lot size 1.5 acres for first five lots (i.e. c10 acres) <br />• Minimum lot size is 2.0 acres for acreage over 10 acres <br />Implications <br />Pros: <br />• Protection of watershed from intense development <br />• Increased protection of streams and reservoirs <br />• Provides more open space <br />• .Reduces inefficient provision of public services <br />• Reduces air pollution and taaffic <br />• Rural Chazacter Preservation <br />Cons: . <br />• Perceived loss of valhae on property <br />• May place upward ~+essure on affordable housing in the county <br />2. PUBLIC HEARING NOTIFICATION PROCESS <br />Existin C ditions <br />• One method of public hearing notification in ordinance <br />Proposed Ordinance <br />• Provides a second option as approved in State Statutes to include an `Open House' phase with staff prior to <br />public hearing for County proposed amendments <br />• Clarifies. the procedures for notification <br />
The URL can be used to link to this page
Your browser does not support the video tag.