Browse
Search
Agenda - 05-03-2000-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 05-03-2000
>
Agenda - 05-03-2000-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:10:35 AM
Creation date
8/29/2008 11:18:07 AM
Metadata
Fields
Template:
BOCC
Date
5/3/2000
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-03-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Minor Amendments to Plans and S cifications 19 <br />Amendments to the plans and specifications of the stormwater control structure and/or the <br />operation and maintenance plan or manual may be approved by the County Engineer, <br />provided that'the changes do not involve a change in the size or location of the structure. <br />Proposed changes shall be prepared by a North Carolina registered professional engineer or <br />landscape architect (to the extent that the General Statutes, Chapter 89A, allow) and <br />submitted to and reviewed by the Erosion Control Supervisor prior to consideration by the <br />County Engineer. <br />a. If the County Engineer approves the proposed changes, the owning entity of the ~. <br />stormwater control structure shall file sealed copies of the revisions with the Erosion '~ <br />Control Supervisor. <br />b. If the County Engineer disapproves the changes, the proposal may be revised and <br />resubmitted to the Erosion Control Officer as a new proposal. If the proposal has ', <br />not been revised and is essentially the same as that already reviewed, it shall be ~~ <br />returned to the applicant. <br />c. The County Engineer shall report any such revisions to the Boazd of County ',, <br />Commissioners at the next available regular meeting. <br />6. Ma'or Amendments to Plans and S cifications <br />Amendments to the plans and specifications of the stormwater control structure and/or the <br />operation and maintenance plan or manual which involve a change in the size or location <br />may be approved by the Soard of Commissioners after receiving a recommendation from <br />the County Engineer. Proposed changes shall be prepared by a North Cazolina registered <br />professional engineer or landscape architect (to the extent that the General Statutes, Chapter <br />89A, allow) and submitted to and reviewed by the Erosion Control Supervisor prior to ~„ <br />review by the County Engineer. <br />7. Revision of Plan Required if Found to be Inadequate <br />If the County finds that the operations and maintenance plan or manual is inadequate for <br />any reason, the owning entity shall be notified of any required changes and shall prepare <br />and file copies of the revised agreement with the Orange County Register of Deeds, the <br />Erasion Control Supervisor, and the owning entity. <br />c) Inspection and Release of the Performance Sand <br />1. Inspection by Erosion Control Supexvisor <br />The stormwater control structure shall be inspected by the Erosion Control Supervisor, i <br />after the owning entity notifies the Erosion Control Supervisor that all work has been <br />completed. At this inspection, the owning entity shall provide: <br />
The URL can be used to link to this page
Your browser does not support the video tag.