Orange County NC Website
15' <br />U-ENO-PW-New 70% <br />Development ISR in Commercial and/or Industrial Nodes as designated in the Land Use <br />Commercial Area Element ~f the Comprehensive Plan (high-density option) with structural <br />BACK-PW BMPs if ISR ~ 12%; <br /> .AND <br /> 50%ISR for all fire stations and solid waste collection centers outside of <br /> Commercial and/or Industrial Nodes as designated in the Land Use Element <br /> of the Cornprehensivc Plan, with structural BMPs if ISR ~ 12%; <br /> AND <br /> 12% 1SR for all other non-residential uses outside of Commercial and/or <br /> Industrial Nodes as designated in the Land Use Element of the <br /> Comprehensive Plan (BMPs cannot be used to satisfy watershed <br /> requirements); <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> A limit of 1,151 acres ofnon-residential use throughout U-ENO-PW (5.0%) <br /> and 163 acres throughout BACK-P W (1 %). <br />HYCO-PW 50%ISR for all fire stations and solid waste collection centers; <br />FLAT-PW AND <br /> 12%ISR for all other non-residential uses; <br /> AND <br /> on-site infiltration of the first inch of stormwater runoff; <br /> AND <br /> a limit of 1% of the watershed for non-residential use (37 acres in HYCO- <br /> PW, 66 acres in FLAT-PW). <br /> BMFs cannot be used to satisfy watershed requirements. <br />L-ENO-PW 70% impervious surface, with structural BMPs required when impervious <br /> surface exceeds: <br /> 24% (w/ curb and gutter); or <br /> 36% (w/o curb and gutter). <br />HAW-PW 2a% impervious surface limit. <br />JORDAN-PW BMPs cannot be used to satisfy watershed requirements. <br />