Orange County NC Website
ORANGE COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: Mav 3, 2000 <br />i <br />Action A enda <br />Item #~ ~, <br />SUBJECT: Quarterly Public Hearing Legal Advertisement--May 22, 2000 <br />DEPARTMENT: Planning & Inspections PUBLIC HEARING: (Y/l~ NO <br />ATTACHMENT(S): <br />1) Legal Ad <br />2) Upper Eno Proposed Amendments <br />3) Proposed Public Hearing Notification Amendments <br />4) Proposed EC-5 Modification Amendment <br />5) Soil Erasion and Sedimentation Amendments <br />6) State Model Ordinance -Neese River Basin <br />(Under Separate Cover) <br />INFORMATION CONTACT: <br />Robert P. Davis Ext. 2580 <br />Craig Benedict Ext. 2592 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Durham 688-7331 <br />Mebane <br />Chapel Hill <br />227-2031 <br />967-9251 <br />PURPOSE: Consideration of the Legal Ad for the May 22, 2000 Public Hearing. <br />BACKGROUND: <br />Re u <br />• 1) Amend the Upper Eno Watershed Protection Ordinance <br />• Propose to adopt the same land use density/intensity regulations as for the University Lake and Cane <br />Creek watersheds <br />• Cluster and conventional subdivisions <br />• 2) Revise the Public Hearing Notification Process in the Zoning Ordinance <br />• Provides for an alternative method of public notification and clarifies existing procedures <br />• 3) Amend the application criteria for establishment of the Existing Commercial-V (EC-5) zoning district <br />• Sets locational staadards for the modification of EC-5 districts <br />• 4) Adopt new ordi~aiaee for Neese River Basin Stormwater Protection Program <br />• State Law requites adoption of this draft ordinance by August 1, 2000 for state review <br />• Delegation of buffer program to Orange County <br />• Implementation by February 1, 2001 <br />• 5) Amend the Soil Erosion and Sedimentation Control Ordinance <br />• State-mandated changes to conform to the Model Ordinance of NC Sedimentation Control Commission <br />Location <br />Amendment number 1 will apply to the Upper Eno Watershed only <br />Amendment numbers 2, 3 and 5, if adopted, will apply to the entirety of Orange County lying outside the . <br />municipalities and their extraterritorial jurisdictions, if any <br />Amendment number 4 will apply to the portion of the Neese River Basin within the Orange County Zoning <br />jurisdiction <br />