Orange County NC Website
14 <br />threshold for co-located school/park land acquisition-~ne~ <br />~£e <br />To address the estimated $10.12 million in future park needs, the <br />following actions should 'be taken to use existing bond funds and <br />address long-term needs. . <br />1, The remaining $2.89 million in land acquisition funds from the 1997 parks <br />bond should be used for acquisition of lands identified as sites for long-term <br />parks use as soon as possible. <br />Z. The balance of funding should be an estimated $8 million parks bond <br />Developing a program for identifying and acquiring long-term park <br />sites at this time will greatly reduce the cost of meeting long-term <br />park needs. <br />