Orange County NC Website
14 <br />threshold for co-located school/park land acquisition d <br />//ww /~w~~wwi/ <br />r <br />To address the estimated $10.12 million in future park needs, the <br />following actions should betaken to use existing bond funds and <br />address long-term needs.. <br />1. The remaining $2.89 million in land acquisition funds from the 1997 parks <br />bond should be used for acquisition of lands identified as sites for long-term <br />parks use as soon as possible. <br />2. The balance of funding should be an estimated $8 million parks bond: <br />~~~~ L~wr~w/_w/~w~ilw/ /+w wwwri/iw+Fww/ ~~i i/~~w <br />~wM ~ ~r~wr. r ~ <br />~7 <br />Developing a program for identifying and acquiring long-term park <br />sites at this time will greatly reduce the cost of meeting long-term <br />park needs. <br />a, <br />,k ` <br />'~ <br />