Browse
Search
Agenda - 04-17-2000-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 04-17-2000
>
Agenda - 04-17-2000-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:58:12 PM
Creation date
8/29/2008 11:17:40 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2000
Document Type
Agenda
Agenda Item
9a
Document Relationships
2000 NS Contract - Manager - Contract with OWASA to Extend Main Water Lines to Historic Rogers Road Neighborhood
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 04-17-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pa 8 <br />2. Design phase. <br />a. A design consultant shall be selected by and under contract with <br />OWASA to develop plans for the Project. The design shall be based on specifications and <br />requirements provided by OWASA. Both parties shall approve the scope of work for the <br />design consultant. <br />b. The costs of the design work shall initially be paid for by OWASA. <br />The County shall periodically reimburse OWASA for all costs associated with the design <br />of the Project. <br />c. In order to ensure proper and effective project management, the design <br />~1 <br />consultant and any sub-consultants shall report to OWAt, .,. , , ff who shall work closely <br />~i~ <br />with County staff to ensure the County's requirei~`~~ the ',~ 'ect are met. In the <br />event of any apparent conflicts between th ~ ~ ~ ~ ~,~d OWASA's requirements, the <br />~, ~a . <br />parties shall work together to f ~ ,. ~ bl~~ mpromise and accommodations for the <br />Project. ~ '. , ~~,s'y~` . <br />.~ # ,~~ <br />d. In clo r .oy . , tion with OWASA and consistent with the need for <br />effective project management as outlined in Section 2c above, the County Staff will have <br />full access to the design consultant and all relevant sub-consultants for any aspect of the <br />Project. OWASA~will authorize the design consultant and subcontractors to meet with <br />County representatives or provide any information needed by the County on any aspect <br />of the Project. <br />3. Construction phase. <br />a. The bidding procedure for the construction contract shall be. <br />
The URL can be used to link to this page
Your browser does not support the video tag.