Browse
Search
Agenda - 04-17-2000-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 04-17-2000
>
Agenda - 04-17-2000-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:58:12 PM
Creation date
8/29/2008 11:17:40 AM
Metadata
Fields
Template:
BOCC
Date
4/17/2000
Document Type
Agenda
Agenda Item
9a
Document Relationships
2000 NS Contract - Manager - Contract with OWASA to Extend Main Water Lines to Historic Rogers Road Neighborhood
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 04-17-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 25, 2000 <br />OWASA ORANGE WATER & SEWER ALITH4RITY <br />Quality Service Since 1977 <br />February 25, 2000 <br />Mr. Paul Thames, P.E. <br />County Engineer <br />Orange County <br />Post Office Box 8181 <br />Hillsborough, NC 27278 <br />RE: WATER MAIN EXTENSION PR03ECT_1N THE ROGERS ROAD AREA <br />Dear Mr. Thames: <br />This is in continuation of our February 9, 2000 meeting in regards to the above <br />referenced project. Based on our understanding of the project we are providing you, for <br />your review and comments, a draft copy of an Interlocal Agreement between OWASA <br />and the Orange County. <br />Exhibit A of the draft agreement represents the area included for extension of public <br />water mains as a part of this project. The agreement has been compiled with the <br />understanding that OWASA's staff will manage this project during the design and <br />construction, phases. Once the project is complete, OWASA will assume ownership of the <br />public water main for operation and maintenance. The draft agreement also reflects our <br />understanding that the County agrees to reimburse OWASA for all expenses related to <br />this project, including design, construction and all reasonable administrative overhead <br />costs associated with OWASA's staff for overseeing and managing this project. <br />The total length of the project is approximately 7,000 LF. We envision that it will take <br />twelve (12) months. to complete the project. Please refer to Attachment "A". We also <br />estimate that the total project cost will be $550,000, as detailed in the Attachment "B". <br />I am looking forward to working with you and Orange county on this important project. <br />Please call me if you need more information. <br />Sincerely, <br />~~~~ <br />M. imtiaz Ahmad, P.E. <br />Director of Engineering and Planning <br />4 <br />Attachments <br />c: Ed Kerwin <br />Tom Condit <br />
The URL can be used to link to this page
Your browser does not support the video tag.