Browse
Search
Agenda - 04-11-2000-4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 04-11-2000
>
Agenda - 04-11-2000-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:00:28 PM
Creation date
8/29/2008 11:17:14 AM
Metadata
Fields
Template:
BOCC
Date
4/11/2000
Document Type
Agenda
Agenda Item
4
Document Relationships
2000 S Planning - Proposed Contract for Student Generation Rate and Impact Fee Study
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 04-11-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.z <br />Task 2: Conducting Survey. <br />If the approach of the students filling in the one-page survey form is not taken, we will conduct <br />a sample survey of the approach that is agreed upon for collecting the appropriate data, After <br />this pre-test is reviewed and agreed upon, then the full sample will be pursued. Once the <br />student generation rates are obtained by housing .type and bedroom count (if appropriate), these <br />results will be tabulated. <br />If there is a need to obtain a sample of total housing units, with and without public school <br />students and their ,bedroom count, apre-test will also be conducted for the approach taken. <br />After this is agreed upon, then a statistically valid sample will be taken. <br />It should, be noted that the samples will adhere to each district. It is anticipated that the student <br />generation factors will differ by district by housing unit. <br />There are two written products that are anticipated in this task. The first is a memorandum on <br />the results of the pre-test, if appropriate. The second product would be the results of the <br />findings of the tabulation. , <br />Wark Product: Memoranda on Pre-test (if appropriate) and Final Results <br />Task_3;_ _ Preparation of Public School Student Generation Rate Reports. <br />Based on the above tasks, TA will prepare a report for each of the school districts on the public <br />school student generation rate by type of housing unit, and by bedroom count, if appropriate. <br />The report will be easy to understand and have appropriate graphics and tables. It will have a <br />concise executive summary. A draft will be prepared far the client for review. After mutually <br />agreed changes are made, the final report will be issued. <br />Wark Product: Public School Student Generation Rate Reports <br />VI. IMPACT FEE METHODOLOGY AND SCOPE OF WORK <br />The methodology to be utilized is discussed first. This is followed by the scope of work for the <br />preparation of the school impact fees for each of the districts. <br />A. Impact Fee Methodology <br />A's discussed in the specific tasks below, .the impact .fee methadology utilized by TA will <br />include analyzing the existing school construction standards as well as the construction <br />standards for new schools. As part of the forecast of capital improvement needs that will be <br />utilized for the impact fee analysis as well as the cash flow, the. school capital improvement <br />costs 2005 and 2010 would be projected. Also as part of the methodology, appropriate credits <br />would be deducted in the calculation of the impact fee in order to avoid the double payment <br />issue. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.