Browse
Search
Agenda - 03-29-2000-3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 03-29-2000
>
Agenda - 03-29-2000-3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:16:34 PM
Creation date
8/29/2008 11:16:45 AM
Metadata
Fields
Template:
BOCC
Date
3/29/2000
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 03-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 14,1999 <br />Objective 4: <br />16 <br />To educate septic system pumpers regarding measurement of biosolids and indicated pumping. <br />Yeaz 2 <br />Educate S% of pumpers. <br />Establish voluntary `referred list" for those completing training. <br />Ensure 100% complete training evaluation. <br />Conduct survey with at least 50% of pumpers to establish baseline data regazding the frequency <br />of checking vs. pumping. <br />Survey 20% of homeowners to identify frequency of pumping. <br />Use OWASA dumping slips to track pumping. <br />Year 3 <br />Same as above. <br />Follow-up with pumpers to assess utilization of forms and check changes in pumping7checking <br />behavior. ~ . <br />Measures• <br />Number trained. <br />Number on preferred list. <br />Participation in pumpers survey/ frequency of pumping. <br />Participation in homeowner survey regazding pumping frequency. <br />Objective S: <br />To educate the wastewater system operators and, management entities to accept septage and <br />support only appropriate transactiions. <br />Year 2 <br />Send informational packet to 100% of operators. <br />Meet with 100% of operators to ensure policies are understood. <br />Establish a method (wanking with the operators) of tracking transactions in frequency and <br />appropriateness (e.g. form for record keeping, sign-in information etc.). <br />Year 3 <br />Follow up with operators to identify system changes. <br />Identify other training needs. <br />Measures• <br />Number trained (% of operator systems employees trained). <br />Use of record keeping system by pumpers and operators. <br />
The URL can be used to link to this page
Your browser does not support the video tag.