Browse
Search
Agenda - 02-29-2000-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 02-29-2000
>
Agenda - 02-29-2000-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:06:05 AM
Creation date
8/29/2008 11:16:09 AM
Metadata
Fields
Template:
BOCC
Date
2/29/2000
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 02-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selection and Implementation Services for an <br />Integrated Information Management System <br />Orange County <br />North Carolina <br />B. Benefts of a Structured System Selection Process <br />A number of significant benefits result from a structured project approach, including: <br />• Well defined objectives, requirements and design <br />• An independent and objective analysis of potential alternatives <br />• An orderly, well-planned analysis of systems alternatives <br />• Time savings through a structured approach <br />• Consistent information provided to each vendor <br />• An education process for the organization <br />• Abetter understanding of the capabilities, benefits and costs of each alternative <br />• Selection of systems and technology that satisfy both the short-term and long- <br />range objectives and requirements of the organization <br />C. The Systems Selection Process Diagrams <br />The systems selection process diagrams aze contained on the following pages. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.