Browse
Search
Agenda - 02-29-2000-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 02-29-2000
>
Agenda - 02-29-2000-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:06:05 AM
Creation date
8/29/2008 11:16:09 AM
Metadata
Fields
Template:
BOCC
Date
2/29/2000
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 02-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selection and Implementation Services for an Orange Caunty <br />Integrated Injormation Management System North Carolina <br />1 '~ <br />4. Conduct a "kick=ofF' meeting with appropriate personnel from the organization. <br />The purpose of the meeting will be to explain: <br />• Purpose of the project <br />• Systems selection methodology and process <br />• Responsibilities of all parties involved in the project <br />• Project organization <br />• Timetables <br />• Questionnaires <br />• Other related considerations <br />5. Obtain and analyze the following background information: <br />• Organization charts <br />• Computer facilities <br />• Hardware configuration <br />• Systems software <br />• Application software <br />• User equipment <br />• Documentation <br />• Communication network <br />• Costs related to the existing system <br />6. Schedule various meetings with personnel from each department and operating <br />azea to review and discuss existing and future information systems and <br />technology needs. We will use a combination of group workshops and individual <br />interviews for these meetings. <br />7. Meet with the personnel identified in the above step to review existing manual <br />and automated systems and operations. We will evaluate the quality, <br />effectiveness and flexibility of existing systems in terms of satisfying the existing <br />and future operating needs and information requirements of the organization. <br />During the interview process, the following information will be gathered and <br />confirmed: <br />• Workflow within each department <br />+ Copies of appropriate records, forms and reports being used in each <br />depaztment <br />• Write-ups and other documentation on present policies and procedures for <br />each functional azea <br />• lnformation regazding future automation needs <br />8. Review the information gathered during the interview process and complete the <br />information needs analysis. This information will form the basis for the <br />rn near ~.r..~~..a-.... r__ <br />
The URL can be used to link to this page
Your browser does not support the video tag.