Orange County NC Website
BOOK 7 PAGE 52 <br />"Re: Proposed Waste Lift Station In McPherson Road <br />Mebane. N. C. <br />The following is a brief outline of the effect the prapcsed waste lift <br />station in McPherson Road, Mebane, N. C., will have on the carrying capacity of <br />the 3" gravity sewer main recently constructed by Orange County in Year Tree <br />Road and Nicholson Street south of Mebane, N. C. This 8" sewer main .:as in- <br />stalled on a 0.65% grade and therefore has a maximum carrying capacity of 400 <br />GPE or 576,000 GPD (Kutter's Formula, n = 0.013). <br />The waste lift station that was approved for construction on the Access <br />Road east of the Mattress Factory Road was-to handle a daily volume of 487000 <br />gals. Because of the erratic way in which the waste will arrive at the lift <br />-cation, we are proposing the installation of 220 GPM pumps (316,800 GPD). The <br />Lift Station is designed so that 350 GPM pumps (500,000 GPD) could be installed <br />in the future but, before this can be done, the Town of Mebane will have to in- <br />larger pipes for their outf 311 sewer and will have to relocate the terminal <br />point of the 8" force main to discharge into this new outfall. <br />The Town of Mebane and the Alamance Count?r Industrial Development Corporation <br />have received approval from the State Stream Sanitation Cord ttee,.subject to <br />review and approval of plans and specifications, for the installation of a waste <br />lift station in McPherson Road on the south side of Mebane. The approval was <br />based on an anticipated flow of 26,000 GPD. A station with 100 GPM pumps (144,000 GPD) <br />is proposed here, not only to take care of the maximum rate of flow that might he <br />expected, but also to provide a reasonable velocity in the 4" diameter force main <br />that is proposed for discharging the waste from this station into Orange County's <br />S" gravity sewer in the manhole at the intersection of Pine Tree Road and Nicholson <br />Street. <br />With a maximum carrying capacity of 400 GPM, it is now being proposed that the <br />8" gravity sewer he loaded with: <br />1. Orange County's Waste Lift Station east of <br />Mattress Factory Road 220 GPM <br />2. Proposed Waste Lift Station on McPherson Road 100 GPM <br />Total 320 GPM <br />This would still leave a capacity of 80 GPM in the 8" gravity sewer. <br />Mr. Alley was questioned as to the percentage of capacity of the sewerage <br />line would be utilized by granting permission for the sewerage tap. He replied <br />that the Textured Yarn Plant would consume twenty-five percent (25%) usage of <br />the current sewerage line. Discussion ensued. <br />Upon motion of Commissioner Ward, seconded by Commissioner Ray, it was moved <br />that said request be granted provided that the Alamance County Board of Commissioners <br />and the Town of Mebane commit themselves to the guarantee that they will restore,for <br />the use of Orange County, the capacity use of said line at such time when it becomes <br />evident that overloading of the line will occur because of additional industrial <br />development in Orange County. <br />Chairman Bennett called for a vote on this motion. Commissioners Ward and Ray <br />voted ave and Commissioners Walker, Smith and Bennett voted nay. Chairman Bennett <br />declared the motion defeated. <br />Commissioner Smith inquired of I;r. Alley as to the cost involved in the <br />construction of the 800' of sewerage line. The Engineer sated that the approximate <br />cost was $6,000.00. <br />Upon motion of Commissioner Smith, seconded by Cc_^missioner Walker, it was <br />moved and unanimously adopted that said request for a sewerage tap would be agreeable <br />to the Orange County Board of Commissioners upon payment to the Town of Mebane <br />of one-half (1/2) the cost incurred for the construction of the 800' sewer line <br />provided that a letter from the Town of Mebane be forwarded to the Orange County <br />Board of Commissioners to the affect that said agreement is acceptable to the Town <br />of Mebane and that the payment of the requested sum will be included in the payment <br />due Orange County on the bonded indebtedness. <br />The clerk was instructed to inform the Town of Mebane of said action. ^i <br />Mr. Alley presented color swatches and requested that a decision be made <br />concerning which color would be used on the water tank located in the Town of J <br />Mebane. Upon motion of Commissioner Smith, seconded by Commissioner Ward, it <br />was moved that said tank be painted a sky blue..' <br />Fred Cates, Mayor of the Town of Hillsborough, members of the Hillsborough <br />Board of Alderman, Fred Sharpe, and the Town Attorney were present. <br />r