Browse
Search
Agenda - 02-29-2000-8a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 02-29-2000
>
Agenda - 02-29-2000-8a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:09:10 AM
Creation date
8/29/2008 11:15:59 AM
Metadata
Fields
Template:
BOCC
Date
2/29/2000
Document Type
Agenda
Agenda Item
8a
Document Relationships
2000 S Contract - ERCD - Callemyn Parker Inc Boundary and Conservation Easement Survey of Duke Forest Property for County Acquisition
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2000
Minutes - 02-29-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Land Surveyor The Summit at Meadowlands <br />allerrr n 1000 Corporate Drive, Suite 101 <br />~t Hillsborough, NC 2727E <br />ar~CeY Ins' - Telephone (919) 732-38$~ <br />Fax (919) 732-667E <br />Civil Engineer <br />3 <br />CONTRACT FOR SllRVEYlNG SERVICES <br />This contract is between CALLEMYN-PARKER, INC. (CPI), Engineering and Land Surveying, 1000 <br />Corporate Drive, Suite 101, HiNsborough, North Caraina 27278 and ORANGE COUNTY <br />ENVIRONMENT AND RESOURCE CONSERVATION DEPARTMENT (Client) c/o Rich Shaw, of PO Box <br />8181, Hillsborough, North Carolina, 27278. <br />This is an "Hourly Rate" Contract <br />CPI agrees to provide the folloNring services to land located west of Hillsborough, on the north side of US <br />70, adjacent tv the Orange-Alamance Water System and Corporation Lake c:ontairting approximately - <br />62.7 acres: <br />SCOPE OF WORK <br />Boundary survey and recordable map. <br />« Delineation of 300-foo# buffer from Corporation Latce, McC,owan Creek and both sus of a trib~ary <br />that Bows through the property. <br />• Survey and stake up to 12 comers of proposed new buffer, exact location to be picked by Orange <br />County. Lines between comers to be flagged on . <br />TOTAL ESTNIAATED COST: X5,617'.00 <br />SUPPLEMENTAL WORK <br />If the scope of work changes due to unforeseen circumstances and additional work is needed, it is <br />understood that CPI will notify the Client and discuss the change in the scope of work and the estimate <br />before proceeding. <br />REIMBURSABLE EXPENSES <br />Direct expenses such as costs for printing, mai~ny, and mileage, etc. shat! be billed according to the <br />Schedule of Standard Rates listed in this Contract. <br />RETAINER <br />Upon receipt of your ret~ner and signed contract, we will begin work as soon as our schedule permits. <br />Retainer. 1 500.00 <br />ITEMS NOT INCLUDED <br />• Fees for any applicationsJpermits rsquirsed by regulatory agenaes. <br />• Off-site field surveying or engineering. <br />Construction management or inspection. <br />• Private road certificationrnspection. <br />OCERCD Revised <br />February 1,2000 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.