Orange County NC Website
G r <br />j <br />C-1 <br />^ CONTRACT pOR LA= ORANGL•' DAM <br />THIS AGREF,11ENT, Made and contracted this <br />19 G 7 _Z__ day of <br />between the Board of commissioners of Orange <br />County, N. C., party of the first part and if <br />U party of the second part. <br />Section 1. WITNESSETH: That for and in consideration of the <br />paymenrstand agree tntts totbe p de and performed by the said part, and r e even date with these Y expressed in the bond party of the of the second presents, and hereunto annexed, the s bearing <br />part agrees with the said party of the firstapa party <br />his, their, or its own proper cost and expense and with skill and <br />diligence, to do all the work and ?? at <br />d construct and complete read furnish all the materials necessary <br />to Lake nge <br />portion thereof as may be awardedotousaidhContractor#o Dam' or such <br />such material as may be awarded, as herein set forth alltinfac?lish <br />cordance with the specifications attached and the plans and the <br />instructions to bidders, and the proposal, and such detailed directionF <br />drawings during the tC., auetay be given by the Engineer from time to time <br />, and in full compliance with this agreement. <br />section Z. And the said party of the second part agrees to <br />receive the prices stated in the proposal attached in full com- <br />pensation for furnishing materials and for all labor in moving ma- <br />terials and executing all the work contemplated in this contract; <br />the party of the second part for said consideration shall Lie responsi- <br />ble for all loss or damage arising out of the nature of the work <br />aforesaid or from any action of f ponsi- <br />obstruction or difficulties whicA he elements, or from any <br />bstrn and d or may be encountered in he rose seen <br />description eli ertedfwith the uoand for all risks of every prose <br />until their final completion and acceptance, alsonforhallaexpe seep <br />incurred by.or in consequence of the suspension or discontinuance of <br />said work and furnishing said materials, and for well and <br />Co:tlpleting the whole work and for furnishin <br />to the lens, faithfully <br />them. P specifications and zequirementssofdthetEngineeraunder <br />zng <br />Section 3. Whenever the words •aoard" or + <br />they shall be held to mean, The.3oard of Commissioners 1s or are used, <br />.of orange County, 2J. C., party of the first part. rqhenever the "Contractor" is used it shall be held to ? legal agents <br />of Contractors or an me, mean the Contractor or fi=rm <br />the-work or materials herein <br />r of the firm specified, viz. thet par arty for an <br />Part of this agreement or his, their, or its authorized agent. When- <br />ever the word "Engineers" is used, it to of the second <br />Pricgez, or their authorized assistantsin;sobfareas authorityomayabe <br />delegated to such assistant, <br />I <br />Z <br />4