Browse
Search
Minutes - 19670807
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2014 10:42:08 AM
Creation date
8/13/2008 12:04:40 PM
Metadata
Fields
Template:
BOCC
Date
8/7/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.r ?fc 1_ <br />_. / Y <br /> S-4 <br />desired results. Should it appear advisable, in the <br />opinion of the Engineer, however, to deviate from the <br />methods herein prescribed in order to secure an embankment <br />that will fulfill the intent of these specifications, the <br />contractor shall, without additional compensation, make <br />such changes in methods as the Engineer may direct. <br />shallow test holes shall be dug from time to time j <br />-and filled with water to determine the amount of seepage <br />through the embankment. <br />The price named in the proposal per cu. yd. of <br />embankment will be paid for the actual volume of the <br />completed compacted embankment to the lines shown on the <br />drawings or as required by the Engineer, and no allowance <br />will be made for any change in volume. Excavated material <br />from any source that is used in the embankment will not <br />be paid for as excavation. The stripping of borrow pits <br />will be paid for. <br />CONCRETE SPILLWAY: A concrete spillway of the side channel <br />and chute type s all be constructed as shown in the drawings. <br />Excavation for the spillway shall be completed and fine <br />graded to the neat lines shown. Cut-off walls, excavated <br />into the earth or rock, shall be constructed as shown, the <br />concrete being placed against the earth as excavated without <br />forms, so as to provide a watertight condition. <br />Construction--contraction joints shall be placed at <br />50 feet intervals as shown, .with cut-off and expansion <br />joints as indicated in detailed drawings. To prevent uplift <br />from ground water drain pipes shall be placed in the concrete <br />slab of the spillway at intervals shown in the drawings. <br />Drains or weep holes shall also be provided in the downstream <br />cut-off at the end of the concrete spillway. <br />Payment for concrete in the spillway slab and side- <br />walls and for the cut-off walls, including steel reinforce- <br />sent, shall be paid for at the unit price bid in the <br />proposal. <br />GATE SHAFT: The gate shaft, including bridge, shall be <br />constructed as shown in plans, from the depth indicated to <br />the floor shown, at, Elevation 626. The work shall include <br />all wall castings and the 24" sluice gates and the specials <br />for the 48" concrete pressure pipe and the 48" sluice <br />gates and operating stands stems and guides complete, <br />ready for operation. <br />Upon completion of the gate shaft, with the reservoir <br />full and with all sluice gates closed, the structure shall <br />be water tight. <br />The price bid in the proposal shall include the
The URL can be used to link to this page
Your browser does not support the video tag.