Orange County NC Website
<br />S-1 <br />DETAILED SPECIFICATIONS <br />DESCRIPTION: The work covered by this contract consists <br />0o an Larth Dam to-lie located on the-East fork of the Eno <br />River, approximately 5 miles north of the Town of Hills- <br />borough, N. C., and approximately 1.5 miles west Of N. C. <br />Highway 66. Included in the project is the preparation of <br />approximately 0.75 mile of new road, clearing the lake area, <br />excavation for the dam foundation and spillway, earth <br />embankment, concrete spillway and gate shaft and outlet <br />pipe through the dam. The watershed area above the dam <br />site is.9.6 square miles. <br />CLEARING: The entire site to be covered by the lake and <br />the embankment and the new section of the access road shall <br />be cleared of all trees. In the lake area all underbrush,. <br />saplings and small trees less than 12 inches in circumference <br />shall be cut to the ground. Trees 12 inches and larger in <br />circumference shall be cut to within one foot of the ground. <br />In a strip 10 feet wide just within the wetted area all <br />stumps, roots, etc. shall be removed. Trees shall be <br />trimmed and cut to cord wood or merchantable timber length, <br />and shall be piled neatly at points to be designated out- <br />side the wetted area. All brush, stumps, roots, and rubbish <br />shall be piled and burned, and the ashes thoroughly scattered. <br />All clearing and burning shall be done in such a manner as <br />not to injure standing trees, shrubs and other property <br />adjacent to the areas to be cleared. All burning shall be <br />under the consta.it care of a competent watchman. All timber <br />and cord wood shall remain within the control of the owner. <br />STRIPPING: The surface of the site to be occupied by the <br />new road, the embankment and spillway shall be stripped of <br />all vegetable matter and surface soil to a depth of at <br />least one foot. This material from the spillway and embank- <br />ment shall be deposited in a designated location below the <br />dam, and upon completion of the embankment shall be spread <br />upon the down-stream slope to a depth of about one foot in <br />addition to the line of the embankment shown in the drawings. <br />The road shall be cleared and grubbed to a width of 30 feet. <br />The contractor shall then provide sufficient surface <br />material to allow for use of the road by his equipment until <br />completion of the contract. <br />EXCAVATION FOR DA-14 FOUNDATION: After the site for the <br />embankment shall have been cleared and stripped, it shall <br />be prepared for the embankment by the removal of all organic <br />matter, soil, sand, muck, loose rock, and other unsuitable <br />material down to solid rock or other hard, firm material <br />satisfactory to the Engineers as a suitable foundation. <br />All excavated material shall be moved outside the embank- <br />ment site, and before completion of the work shall be <br />deposited so as not to leave any decided or unsightly piles. <br />1