Browse
Search
Minutes - 19670807
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2014 10:42:08 AM
Creation date
8/13/2008 12:04:40 PM
Metadata
Fields
Template:
BOCC
Date
8/7/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Gs-7 <br />All sluice gates shall be the equal of Rodney Hunt, <br />and shall be approved by the Engineers before being <br />purchased for the work. <br />WATERSTO?S: All waterstops shall be made of plastic and , <br />s a l be t e equal of Durajoint (PVC), as manufactured by <br />Electrovert, Inc., 240 Madison Ave.., New,York', N..Y.,; <br />and shall be installed in strict accordance with the <br />manufacturer's specifications. <br />WOM14ANSHIP: Shall be first-class in every respect. <br />materials and equipment shall be entirely suitable for <br />the purposes for which intended. <br />CLEANING UP: During the progress of the work the Contractor <br />shall keep the premises and vicinity of the work free from <br />unsightly and disorderly piles of debris and materials <br />resulting from or used in his operations. Suitable loca- <br />tions shall be allotted for the various materials, and for <br />debris. The materials shall be kept in their storage <br />locations except as needed in the work, and debris shall be <br />promptly and regularly collected and deposited in the <br />allotted location, the intent being to avoid unnecessarily <br />and disorderly appearance and confusion, and to promote an <br />orderly and efficient conduct of the work. <br />Upon completion of each structure, or element of the <br />work, the Contractor shall shape up the ground adjacent <br />thereto, removing all surplus excavated material and leaving <br />the area free from humps and hollows. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.