Orange County NC Website
<br />Gs-7 <br />All sluice gates shall be the equal of Rodney Hunt, <br />and shall be approved by the Engineers before being <br />purchased for the work. <br />WATERSTO?S: All waterstops shall be made of plastic and , <br />s a l be t e equal of Durajoint (PVC), as manufactured by <br />Electrovert, Inc., 240 Madison Ave.., New,York', N..Y.,; <br />and shall be installed in strict accordance with the <br />manufacturer's specifications. <br />WOM14ANSHIP: Shall be first-class in every respect. <br />materials and equipment shall be entirely suitable for <br />the purposes for which intended. <br />CLEANING UP: During the progress of the work the Contractor <br />shall keep the premises and vicinity of the work free from <br />unsightly and disorderly piles of debris and materials <br />resulting from or used in his operations. Suitable loca- <br />tions shall be allotted for the various materials, and for <br />debris. The materials shall be kept in their storage <br />locations except as needed in the work, and debris shall be <br />promptly and regularly collected and deposited in the <br />allotted location, the intent being to avoid unnecessarily <br />and disorderly appearance and confusion, and to promote an <br />orderly and efficient conduct of the work. <br />Upon completion of each structure, or element of the <br />work, the Contractor shall shape up the ground adjacent <br />thereto, removing all surplus excavated material and leaving <br />the area free from humps and hollows. <br /> <br /> <br />