Orange County NC Website
<br /> P-4 <br />Item 9b. fvj Lineal feet, more or less, <br />of corrugated metal perforated <br />pipe and stone drains, complete Q <br />Dollars <br />r Cents S 3,437 ?0 <br />Item 10. G P 0 square yards, more or <br />less, o stone Riprap, complete, <br />in places @ <br />y Dollars <br />G --' Cents $J?5ao? <br />Item 11. Lump sum pr ce for Stream <br />Control, as specified, <br />/ Le- 212 00--,7 Dollars <br />O Cents S eo cc <br />Item 12. Lump sum price for timngr bridge <br />` <br />as she and specs f ed <br />c mp eta, <br />? <br />? <br />? <br />i /Jy- <br />c:UL7r/r7? , <br />.Sj <br />red <br />r U/ - Dollars <br />-/VO Cents $ <br />Grand Total Price <br />Price at which reinforced concrete is to <br />be added or subtracted in the spillway _ <br />on account of changes ; <br />Dollars per cubic yard. <br />Price at which reinforced concrete is <br />to be added or subtracted in the Gate <br />shaft on account of changesAf6'-'J° <br />Dollars per cubic yard. <br />lie will a?ree to complete the contract aggregating <br />approximately within, _O calendar <br />days from the date of t1 le aw d of the c <br />ntract. <br />o <br />This the kZ4Z day of eIUC 19 <br />TT <br />Name J / e_ <br />~ <br />? <br />? <br />Sy <br />Address ' i:. .S C. 7P?P <br />State LLCeASe No. ?-` <br />