Orange County NC Website
7 ;..? <br />P-2 <br />The Board reserves the right to extend the time <br />allowed for executing the contract and furnishing bond. <br />The undersigned will complete such contracts as it <br />is hereby proposed to enter into within the time stated <br />herein. <br />The undersigned proposes to enter into contract in <br />accordance with this proposal, the instructions to bidders, <br />and the specifications and contract attached,. for Lake <br />Orange Dam for Orange County, N, C., for the following <br />prices: <br />Prices bid for the various items shall include the <br />furnishing of all materials and equipment and doing all <br />the work, and shall include furnishing and doing everything <br />necessary to a complete project in regular and satisfactory <br />operation. The Contractor shall cooperate with other <br />Contractors (if any) on the work and so arrange his work <br />as to cause least inconvenience to all concerned. lie shall <br />be responsible for and correct all damage from any cause, <br />including floods, until the final completion and acceptance <br />of the entire work. <br />Item 1. /00 acres, more or less,of Totals <br />clearing the Lake area 2 <br />e fi/c- r - Dollars <br />n Cents $--1000 .00 <br />Item'2. ( acres, more or less of <br />stripping of the dam foundation Q <br />oc?54/JG?. <br />_eZize 41ne Dollars <br />Cents $ 6. 7Zf 60 <br />Item 3. 16.00u cubic yards, more or <br />less of excavation for the Dam <br />foundation, @ <br />M _ Dollars <br />Cents $ C,/fy? <br />Item 4. pO0 cubic yards, more or <br />less, of Rock Excavation @ <br />Dollars <br />?? Cents g l0 ?° <br />