Browse
Search
Agenda - 02-01-2000 - 8c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 02-01-2000
>
Agenda - 02-01-2000 - 8c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:55:21 PM
Creation date
8/29/2008 11:15:35 AM
Metadata
Fields
Template:
BOCC
Date
2/1/2000
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes - 02-01-2000
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
Minutes - 02-01-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
View images
View plain text
4 <br />B. Roads and Access <br />1. Fran Drive, Old Forest Drive and the portion of Windfall Lane east of the <br />intersection with Fran Drive shall be constructed to standards of the North <br />Carolina Department of Transportation, within a 50' right-of-way, and the <br />construction shall be inspected and approved by NCDOT. The western portion of <br />Windfall Lane from NC 10 to the intersection with Fran Drive shall be <br />constructed to the standards of the North Carolina Department of Transportation, <br />within a 60' right-of-way, and the construction shall be inspected and approved by <br />NCDOT. <br />OR <br />A letter of credit or escrow agreement or other security shall be submitted to <br />secure construction of Windfall Lane, Fran Drive, and Old Forest Drive to the <br />standards of the North Carolina Department of Transportation. An estimate of the <br />construction cost must be prepared by a certified/licensed engineer or grading <br />contractor and submitted to the Planning and Inspections Department. The <br />financial guarantee must reflect 110% of that estimate and be issued by an <br />accredited financial institution licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guarantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />2. An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division for review and approval. <br />3. Approved street name signs shall be erected at the intersection of streets as <br />required in Section IV-B-3-c-12 of the Orange County Subdivision Regulations. <br />Evidence shall be submitted by the applicant that the sign is in place, or a copy of <br />the receipt for purchase of the sign shall be submitted to the Planning Department. <br />4. All lots shall access onto the new subdivision roads. No driveways shall be <br />permitted within 50' of a street intersection. <br />5. The road connection to Old Forest Drive in Wyngate subdivision shall be public <br />and constructed to meet NCDOT standards. <br />C. Land Use Buffers and Landscaping <br />1. Landscaping shall be installed or preserved as indicated on the approved <br />landscape plan, and must be inspected and approved by the Planning and <br />Inspections Department. A 75-foot Type E buffer, as defined in the subdivision <br />regulations, shall be installed along Old NC 10.
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).