Orange County NC Website
I Com?enffona1 Plot <br />2 1. Excel Drive shat <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br /> to be shown for <br />2. If a sign is antics <br />3. Property lines to <br />4. Each lot shall co <br /> Division of Emri <br />5. Indicate on preli; <br /> Article 6.23.3a e <br />6. Delineate all stre <br />7. NCDOT shall ap <br /> Access to any lot <br />8. A 75-foot buffer <br /> of NC Highway, <br />9. The acreage of tti <br />10. Stream buffer alc <br />DRAFT <br />PLANNING BOARD MINUTES <br />JANUARY 5, 2000 <br />be public and proposed to be built to NCDOT standards. Sight distance triangles (10' x 70') <br />Leh street. Right-of--ways at intersections shall be improved to NCDOT standards. <br />N04 reserve a sign easement location on corner lot at entrance to subdivision_ <br />MOP at right-of-way line of NC Highway 54. <br />main an adequate area for septic disposal and a repair area as approved by the Orange county <br />*omnental Health <br />ninary plat areas for on-site infiltration of storm water that demonstrates compliance with <br />Pthe Orange County Zoning Ordinance. <br />1111 and stream buffers, if any, on the preliminary plan. <br />prove the location of the proposed private road prior to approval of the preliminary plan. <br />shall be a minimum of 50 feet from the intersection of the rightofways. <br />Type E buffer shall be delineated and shown on the preliminary plan behind the right-of-way <br />A <br />1 lots shall be calculated excluding any acreage within the right-of-way. <br />ng the creek on the western property boundary shall be delineated on the preliminary plant. <br />Holtkamp asked about the trips per day on Excel Drive. <br />Davis said that there would be approximately 80 trips per day on Excel Drive. <br />Chair Barrows asked if more right-of- way would be asked of the adjacent landowners or if it would come out of the <br />subdivision when Excel Drive is upgraded. <br />Davis said that the ri Ight-0f--way would come out of the subdivision. <br />Goodwin asked if there would be a turn lane because Highway 54 is such a busy road. <br />Davis said that eight lots would not necessitate a turn lane. <br />Benedict said that the staff would work with NCDOT to figure out what the threshold is to require a turn lane. <br />Preston asked about tl}e stone quarry in the area and the noise concerns. <br />Davis said that when he was there the blasting was not loud, but the trucks were. <br />Benedict said that there is a plan at the quarry for an amendment to relocate. <br />Strayhorn asked about condition #9 about the acreage of the lots excluding the right-of-way. <br />Davis said that the 7Allison of the lot has to be exclusive of the rigid-of-way. <br />MOTION: moved approval of the Concept Plan for Bingham Oaks, subject to the Planning <br />Staff conditions. Seconded by Leo. <br />VOTE: Unanimou& <br />b. PPrdi nnflfall Plana <br />(Eno Township - 22 Lots) <br />Kirk made the oresentation_ <br />PURPOSE: <br />Consideration of the Ptl'eliminaiy Plan for Windfall Subdivision. <br />33 <br />BACKGROUND: