Orange County NC Website
21 <br />z. <br />elements <br />the need <br />3. <br />4. Funding. <br />with gene <br />fees for x <br />the percea <br />method a <br />: Pkrn: The Board supported the full education plan as presented with <br />intended for general and target specific audiences. Emphasis was placed on <br />ar this comprehensive plam <br />rwn Frequency: The. Board agreed with the committee that the five-year <br />with the homeowner incentive to extend it to ten years with proper <br />cc was the preferred option. <br />The Board chose the hybrid approach of partially paying for the expansion <br />gal fends and making up the rest of the costs with annual operations permit <br />bmission to the Board of Commissions. The Board did not stipulate what <br />tage breakdown should be but felt that this would be the most equitable <br />' distritaing the costs of the program to all those who will benefit from its