Browse
Search
Agenda - 01-18-2000 - 8r
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2000
>
Agenda - 01-18-2000
>
Agenda - 01-18-2000 - 8r
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:56:55 AM
Creation date
8/29/2008 11:15:17 AM
Metadata
Fields
Template:
BOCC
Date
1/18/2000
Document Type
Agenda
Agenda Item
8r
Document Relationships
Minutes - 01-18-2000
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2000
RES-2000-009 Resolution Relative to Efland Sewer System Facilities On or Across Properties Owned or Controlled by Barber and Ross, NC Railroad Co. and Norfolk Southern Railway Co.
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ,1?.4„n?wn are co oe in stnct accordance with speGfcations of the American Railway En ineerin~. , vV,v,7 uA i zruvucn W oegun <br />Southern Corporation. Original and six copies of this form shall be submitted, accompanied g by six g prints Assoa p drawing showing and sowing wing pplanlan , <br />section of crossing from field survey, location in res width , <br />of adjacent structures affecting crossing, and all inform Ga on requiired?in fwidth =igures 11 rand and d 's of A.A EA Specifio oonfs,Pbiic Right <br />is necessary details of sheeting and method of supporting tracks or driving tunnel must be shown P . Part S Pipelinnese% It <br />. If <br />12. Correct name of Applicant: County of Orange 1 <br />.i <br />13.. Post Office address: P.-o. Box 8181, Hillsborough, NC 27270 <br />14. Location: 3 3 0 0 - g- - ?? (direction) Rom nearest R.R. Milepost H-36 <br />1S. Nearest city or town- Mebane County. Orange <br />16. "Within limits of public highway, name: Redman Crossing ..Slats - NQ <br />• Fsd%9LIe-CountYNo•: 13 99 <br />17. Will temporary tract support or rip rapping be required? Yes x p o <br />[ 1 [XJ No - expllain lo-re` and Jack across <br />entire R/W <br />1S. Are there any wires, poles or obstructions to be relocated? [ J Yes JXJ No Temperature <br />19. Product to be conveyed- a n i t a r Sever Flammable? • - <br />(J Yes [X J No Temperature Ambient <br />20. Maximum working pressure: (psi) Feld test pressure: <br />(psi) Type of test <br />21. Location of shut-off valves: a edges of Railroad R/W <br />22. PIPE SPECIFICATIONS CARRIER PIPE <br />CASING PIPE <br />Material <br />Iron ER Weld Steel <br />Material specifications and grade ANSI A 21 -51 API 5L <br />Minimum Yield Strenght (psi) of material 42,000 -Psi ' • 1530 psi <br />Mill test pressure (psi) 350 s i 9 2 0 Psi <br />Inside diameter 3.46" 8.25" <br />Outside diameter 3.96" 8.62511 <br />Wall thickness 0.25" 0.188" <br />Type of seam N/A <br />Field weld all <br />Laying lengths 18 i - a round 20' <br />Type of joints Push-On <br />field weld all <br />Total length within Railroad right of way 230 1 arotinu 2301 <br />VENTS - number: 0 size- height above ground: <br />SEALS - both ends: concrete <br />one end: <br />BURY- base of rail to top of casing: 9 R. 0 <br />BURY - (not beneath tracks): 5 R. 9 <br />in. <br />BURY - (roadway ditches): _ 3 R. 0 <br />in. CATHOOIC PROTECTION - ( ( Yes [XJ No <br />PROTECTIVE COATING - [ ( Yes [ XJ No Give description <br />23. Specify type, size, and spacing of insulators or supports: carrier pipe- supported' by spiders" at <br />9.0, intervals <br />24. Define any special specifications of the pipeline: see above <br />25. Method of installation: Bore and jack casing pipe <br />If application is approved, applicant agrees to reimburse the Railroad for <br />maintenance, and/or supervision necessitated. this any c" incurred by the Railroad incident to installat <br />injuries which arise as a result of this installation. pipeline installation, and further Sgrees to assume all liabillity for accider <br />7- ?- 9? <br />Z - " ..y....,y aF,P,K <br />rohr, Link <br />(SEE SAMPLE ORAWiNG (Exhibit A), and SAMPLE SHEET (Exhibit 9), attached)
The URL can be used to link to this page
Your browser does not support the video tag.