Orange County NC Website
io <br /> B. WATER QUALITY PROBLEMS <br /> Process Steps Response Time Guidelines <br /> i. Environmental Health Division (OCHD) receives request from N/A <br /> resident directly or through another agency. <br /> ii. OCHD contacts American Stone and advises them of.the Contact made within 2 business <br /> request and the nature of the request. No action is required by days of request. <br /> American Stone at this point. <br /> iii. OCHD staff collects water samples for analysis at the State <br /> Laboratory of Public Health. Depending on the samples results, First samples collected by OCHD <br /> additional sampling may be necessary to fully assess the within 10 business days of <br /> problem. [NOTE: The timing of water sample results is not request. <br /> under control of OCHD or Orange County. Results of most <br /> samples are returned within 2-3 weeks]. <br /> iv. Based on the water sample results, OCHD staff will: OCHD confirms or denies well <br /> a. Confirm a well failure exists; or failure claim within 5 business <br /> b. Deny the well failure claim; or days of receipt of the final sample <br /> c. Recommend further study of the well results. OCHD also notifies <br /> American Stone within the 5 <br /> OCDH notifies American Stone if a well failure exists. business day period once a well <br /> failure is confirmed. <br /> v. American Stone consultant visits site and determines whether Consultant visits site within 10 <br /> the well failure is a "probable result" of the quarry activity and business days of request. <br /> reports findings to OCHD. <br /> vi. If the consultant finds that the failure is a "probable result" of N/A <br /> the operation,no further action is necessary by OCHD. <br /> vii. For well failures that are not a probable result of the quarry <br /> operation, OCHD staff recommends: Strategy recommended and <br /> a. A remediation strategy - an authorized Orange County contractor is contacted within 10 <br /> representative contacts the appropriate contractor(s). (Go to business days of receipt of final <br /> step ix); or sample results or after results of <br /> b. Further study by a private consultant to determine the best further study are complete. <br /> remediation strategy. <br /> viii. Private consultant completes study and reports to OCHD (Go Depends on consultant schedule <br /> back to step vii.-a. <br /> ix. Remediation strategy is effected Depends on contractor schedule <br /> Appeals shall be made within 30 <br /> days of the issuance of a claim <br /> denial based on the finding that <br /> X. Appeals by the residents to the Board of Health no well failure exists or other <br /> finding unsatisfactory to the <br /> resident. Once made, appeals <br /> progress according to the Board <br /> of Health Policy on appeals. <br />