Browse
Search
Agenda - 02-18-2002 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 02-18-2002
>
Agenda - 02-18-2002 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 3:43:45 PM
Creation date
8/29/2008 11:14:50 AM
Metadata
Fields
Template:
BOCC
Date
2/18/2002
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
Document Relationships
Minutes - 20020218
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> Attachment ent I <br /> In terms of the proposed process, the Work Group remmmmued that diameter <br /> be deuellm ed along the dines of the current County/schools murder, that would <br /> 1. Have Towns and County develop a property list of projects, with project <br /> cost estimator and reported duration <br /> 2. The County would then consider funding opportunities and schedule of <br /> projects <br /> 3. Onto a lenient receives the proof go-aEead, a Capital Project Commands <br /> would then be developed time step triggers the creation of a Townl0punty <br /> Pm"Project Work Group) <br /> 4. Town and County elected boards would appoint two members W a Par" <br /> Project Work Group far the project <br /> Peter Ftoi set Work Group <br /> • 2elecfai pfYidsla from[he('uwly,and thejudeAGlon Invoked in[M1e project <br /> Relevant taff(iudet <br /> • Aeluvar¢Stefi(8Wga5 PmkslERCD) <br /> Charge to EUCh Parker project Work Group j <br /> The Parks Project WoK Group would memento a rrcommmdalim to each elected <br /> bomdwwoobalmp Poke dalgn and mmnncfion(imlumngphasiH memo and me <br /> himp of design attl mneuaction Consultants and doorstop), commoner; park <br /> operation, slewur prip and maintenance focusing the hubs of opemhoml <br /> consultants),the porous mr doveogral;a park concept plan(including appob�m[e <br /> to say Committees), the homes& for approval of die conegrt plan and park <br /> "nateressitimp"orow and <br /> plans for hoeing cr mclayre m odedulo g of park Residues by any private or own prompt firm ve mgmtizatitn _ <br /> New b rot Parksbonen Spam Proposals <br /> New joint park proposals that have not yet been identified or discussed wood <br /> follow a different protest tort would have the joint park concept reviewed by <br /> the Board of Commbsioners,with a recommendation from the IP Werk <br /> Group (as per schemes item 41 in draft poH©statement) <br /> *Current Joint Town/Consist Parks and Open Spam Profmts purisdimiansl <br /> 1. Homestead Park Aquatim Center(Chapel Hill,Orange County) <br /> 2. Falrvlew Pazk(Orange County,Hillsborough) <br /> S. Smith Middle School Park(Orange County, Cnrsboro) <br /> 4. Gemorwayatfirm o Open Spam dAmpal 111, Orange County, Processor) <br /> 5. Southern Park(Orange County, Chapel Hill) <br />
The URL can be used to link to this page
Your browser does not support the video tag.