Browse
Search
Minutes - 19670612
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 9:07:57 AM
Creation date
8/13/2008 12:04:15 PM
Metadata
Fields
Template:
BOCC
Date
6/12/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 6 FACE 619 <br />•5- <br />approve it without change. <br />Where the permit application is for renewal of the previojs year's Extractive <br />Use Parmlt without change. the previously approved Operations Plan and program <br />may be resubmitted. <br />The Operations Plan and Program shall Include, but not be limited to. the <br />following elements and shall comply with the following requirements: <br />?F 8.2.1 Topographic Map <br />A topographic map at a scale of not more than 100 feet per inch. with, <br />contour intervals not greater than two feet, and accurate to - I foot shall I be <br />included as part of the Operations Plan and Program. and shall show the lot, <br />parcel or premises upon which the extractive use is proposed. as wail as all <br />abutting lots. parcels and premises. Distances between any two points shown on <br />the topographic map shall not exceed two feet In error. Permanent concrete <br />`. markers shall be placed at each corner of said proposed extractive use site In i <br />conformance with standards approved by the Division of Geodetic Survey. of the <br />Worth Carolina Departmant of Conservation and Development. <br />8.2.2 Streams. Roads and Other Features <br />All surface streams and water courses, together with the classifies- <br />tions assigned to them by the Stream Sanitation Committee, and all roads of any <br />type shall be accurately shown on the topographic map required In 8.2.1. <br />8.2.3 Maximum Excavation Size and Estimated Work Schedule <br />- - long-term <br />The Operations Plan and Program shat! show maximum/exca? vat o limits <br />estimated ultimate <br />for the extractive use site. In cluding/maximum depth and surface <br />diameters. <br />g==!=%l6 Maximum surface diameters shall be shorn on the topographic map <br />required In Section 8.2.1 or 'on scaled overlays. Detailed estimates of the <br />excavation work schedule for the permit pprled shall be Included.
The URL can be used to link to this page
Your browser does not support the video tag.