Browse
Search
Minutes - 19670612
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 9:07:57 AM
Creation date
8/13/2008 12:04:15 PM
Metadata
Fields
Template:
BOCC
Date
6/12/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5_ BOOK 6 F.-LE GM <br />and Air Resources. The Operations Plan and Program shall contain specific pro- <br />visions for maintaining the level and quality of the ground water table at the <br />standards obtained from approved analysis of said ground rater table samples. The <br />level and quality of the ground water table shall be maintained as they existed <br />prior to beginning of extractive use processing operations, except that where higher <br />standards are set by the Board of Water and Air Resources the higher standards shalt <br />be maintained. The ground water table and quality portions of the Operations Plan <br />and Program shall be approved in writing by the Board of Water and Air Resources in <br />advance of permit issuance. <br />9.2.5 Water Sources and Waste Water Disposal <br />Estimated required water volumes, the sources of these waters. and treat- <br />ment and disposition plans for waste waters shall be clearly shown in the Operations <br />Plan and Program. The water source and waste water treatment and disposition plan <br />shall be approved by the Board of Water and Air Resources. <br />9.2.6 Disposal of Tailings and Other Solid Wastes <br />Plans for disposal of tailings and other solid wastes shall be clearly <br />shown in the Operations Plan and Program. Where the Technical Review Committee <br />decides that such plans indicate a possibility of damage to any properties or, vegete <br />tion as a result of erosion, silting. landslides. or other Incidents of such dis- <br />posal, it may require the applicant to submit detailed plans and proposals for <br />rehabilitation of such properties. <br />9.2.7 Noise <br />Noise shall be measured on any prororty line of the tract on which the <br />extractive use processing operation is located. Noise shall be muffled so as not <br />to become objectionable due to intermittence, beat frequency, shrillness or <br />intensity. At the property line the sound pressure level of noise radiated con- <br />tinuously from an extractive use shall not exceed the values given in Tables 2 and <br />3 in any octave band frequency. The sound pressure level shall be measured with a <br />
The URL can be used to link to this page
Your browser does not support the video tag.