Browse
Search
Minutes - 19670612
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1967
>
Minutes - 19670612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2014 9:07:57 AM
Creation date
8/13/2008 12:04:15 PM
Metadata
Fields
Template:
BOCC
Date
6/12/1967
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-13. <br />BOOK 6 FACE b27 <br />8.4.2 Aerial Photograph <br />The Rehabilitation Plan and Program shall include a clear. accurately <br />scaled vertical aerial photograph of the proposed extractive use site and all <br />abutting properties, at a scale of not more than 200 feet per .inch. <br />8.4.3 Rehabilitation Plan and Program Objective <br />The Rehabilitation Plan and Program objective shall be cc return the <br />extractive use site to the condition shown in the topographic map and aerial photo- <br />graph required in 8.4.1 and 8.4.2. <br />8.4.4 Regrading, Refertilization, and Vegetation Replacement <br />Plans and work Schedules <br />The Rehabilitation Plan and Program shall include detailed plans and work <br />schedules for regrading, refertilization. and vegetation replacement. developed in <br />terms of the maximum excavation size and the estimated work schedule for the permit <br />period required in Section 8.2.3. <br />8.4.5 Preservation of Topsoil <br />All topsoil removed in the course of extractive use operations shall be <br />preserved for rehabilitation use. Plans for storage and protection of topsoil <br />quality shall be clearly shown. <br />8.4.6 Cost Estimates <br />The Rehabilitation Plan and Program shall include estimates of the cost <br />of restoring the maximum excavation shown in the Operations Plan and Program to <br />surface topography and other conditions existing prior to beginning the extractive <br />use operation. Cost estimates shall also be made for restoring any existing exca- <br />vated areas and the area scheduled to be excavated during the permit period. All <br />such estimates shalt be certified as approximately correct by a civil engineer <br />licensed in the State of North Carolina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.