Orange County NC Website
-13. <br />BOOK 6 FACE b27 <br />8.4.2 Aerial Photograph <br />The Rehabilitation Plan and Program shall include a clear. accurately <br />scaled vertical aerial photograph of the proposed extractive use site and all <br />abutting properties, at a scale of not more than 200 feet per .inch. <br />8.4.3 Rehabilitation Plan and Program Objective <br />The Rehabilitation Plan and Program objective shall be cc return the <br />extractive use site to the condition shown in the topographic map and aerial photo- <br />graph required in 8.4.1 and 8.4.2. <br />8.4.4 Regrading, Refertilization, and Vegetation Replacement <br />Plans and work Schedules <br />The Rehabilitation Plan and Program shall include detailed plans and work <br />schedules for regrading, refertilization. and vegetation replacement. developed in <br />terms of the maximum excavation size and the estimated work schedule for the permit <br />period required in Section 8.2.3. <br />8.4.5 Preservation of Topsoil <br />All topsoil removed in the course of extractive use operations shall be <br />preserved for rehabilitation use. Plans for storage and protection of topsoil <br />quality shall be clearly shown. <br />8.4.6 Cost Estimates <br />The Rehabilitation Plan and Program shall include estimates of the cost <br />of restoring the maximum excavation shown in the Operations Plan and Program to <br />surface topography and other conditions existing prior to beginning the extractive <br />use operation. Cost estimates shall also be made for restoring any existing exca- <br />vated areas and the area scheduled to be excavated during the permit period. All <br />such estimates shalt be certified as approximately correct by a civil engineer <br />licensed in the State of North Carolina. <br />