Orange County NC Website
DobK..: 6 PAGE 624 <br />Mines shall be used to eompute all values for the enforcement of this.provision. <br />8.2.13 Flooding or Depositing <br />core o <br />No extractive use/shall conduct any operations which produce a <br />flooding hazard. erosion hazard. or hazard of depositing excavated materials <br />on neighboring properties at any time. Dikes, dams. or other barriers necessary <br />to prevent such hazard shall be included as pert of sold operations Plan and <br />Program. <br />8.2.14 Public Read or bridge <br />No extractive use operations shall be conducted In such away as to <br />threaten to undermine. flood. or otherwise endanger any public road or bridge. <br />8.2.15 Fencing <br />Areas being excavated shall be enclosed with a cyclone-type wire mesh <br />fare no less then 6 feet in height. located no lass then 10 feat from the ex- <br />cavation edge. <br />,r. <br />,a 8.3 Operations Sand <br />Each applicant for an Extractive Use Permit shall submit. with the Opera- <br />tions Plan and Program, an Operations Bond. Said Bond shall be executed by the <br />applicant as principal and by a corporate surety authorized to do business in <br />this state. in a form approved by the County Attorney, and shall be deposited <br />with the County Administrator. Sold Bond shall be made payable to the County, <br />$300 <br />shall be in a penal sum equal to C=5 per acre of area proposed to be mined <br />$3,000 <br />under the Extractive Use Permit but not less than a minimum sum of <br />and shalt be conditioned that the applicant shell faithfully comply with the <br />., provisions of this ordinance. the terms and conditions of any Extractive Use <br />Permit which may be issued to,him, and the provisions of the approved Operations <br />Plan and Program. i <br />Said Bond shall be maintained as a legally binding obligation throughout <br />.?;. go <br />the perled.for.which the Extroctive Use Permit Is' Issued and for a days <br />4 <br />f <br />i <br />I Ti