Orange County NC Website
} <br />• t <br />,BOOK s FACE <br />8.2.9 Disposal of Tailings and Other Solid lipstes <br />Plans for disposition of overburden, tailings and other solid wastes <br />shall be clearly shown in the Operations Plan and Program. Maximum heights and <br />locations of all waste storage piles and stockpiles shall also be clearly shown. <br />8.2.10 Noise <br />Noise shall be measured on any property line of the tract on which <br />the proposed extractive use operation is located. Noise shall be muffled so as <br />not to become objectionable due to intermittance, beat frequency, shrillness or <br />intensity. At the property line the sound pressure level of noise radiated <br />continuously from an extractive use shall not exceed tto values given in <br />Tables 2 and 3 in any octave band frequency. The sound pressure level shall be <br />measured with a Sound Level Meter and an Octave Band Analyzer that conform to <br />specifications published by the American Standards Association. (American <br />Standard Sound Level Meters for Measurement of Noise and Other Sounds. <br />224.3-1944, and American Standard Specifications for an Octave-Band Filter Set <br />for the Analysis of Noise and Other Sounds. 224.10-1953. American Standards <br />Association. Inc.. New York. N.Y.. shall be used.) <br />Table 2 <br />Maximum permissable sound-pressure levels at specified points <br />of measurement for noise radiated continuously from a facility. <br />Frequency Band Decibel* <br />Cycles Per Second Level <br />20 75 .......... 69 <br />75 - 150 .......... 54 <br />IS(, - 30L .......... 47 <br />300 - 660 .......... 41 <br />600 - 1.200 .......... 37 <br />1,200 - 2,400 .......... 34 <br />2.400 - 4,Suo .......... 31 <br />MOD - 10.000 .......... 28 <br />10.000 - 20,000 .......... 26) (to avoid possible <br />20.000 - 30.000 .......... 25) interference with <br />30.000 - Wow .......... 24) animal experiments) <br />40,000 - 50,000 .......... 23 )