Browse
Search
Agenda - 11-25-2002-c1ae_c2b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-25-2002
>
Agenda - 11-25-2002-c1ae_c2b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:30:48 PM
Creation date
8/29/2008 11:13:45 AM
Metadata
Fields
Template:
BOCC
Date
11/25/2002
Document Type
Agenda
Agenda Item
c1ae_c2b
Document Relationships
Minutes - 20021125
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ur,. 2\~iF;P•';u itcT l i~;\t~\~~~. ;R,7~,i;t~~ -t\.\. i" ~11 \?` ` ..._ ...:~~ i;u `. - `~~` ~`~.' ,. ..1. .,1~0 -. :'.1,.,.., ._~ a1. t..e.a,~..l9vli!5: \: 4,'o].:h'.Idf.fm..~.,u,~ <br />,.\1.;;.:'~;~,.?.1 `3 ~1;~:~tiii;~,~~11`:u~i~Ai.`•.`i;~\1\~allltl\.11`l`\~`\,~\~1•`_~a~~c:5is :~\~,,.i;.. a1} ..,1:....,.~, ss,a.,.,.,:11.,a~.C:;1,,a\ila <br />~2u <br />BOCC Work Session <br />S/29/02 <br />Growth Control Recommendations <br />[. Develop an outline for a special use permit (SUP) process for the subdivision of land <br />creating 20 or more lots to be presented at 9!17/2002 BOCC~meeting <br />II. Notify every applicant for residential subdivision approval: <br />(1) whose application or proposed application is not also for a planned development <br />special use permit; or , <br />(2) whose application or planned application involves the subdivision of land into <br />20 or more lots <br />that the Board of Commissioners will consider amending the Orange County Zoning <br />Ordinance, oa or before December 2, 2002, to provide.thax any subdtvssson of land <br />creating 20 or more lots is a special use requiring a special use permit. <br />The amendments that will be considered may include other procedural and <br />substantive requirements. 'T'hese requirements may include: <br />(a) greater detail, coverage and confirmation of the "yield plan" required in <br />the evaluation of whether the project may be approved as a conventional plan or a <br />flexible plan; <br />(b) professionally prepared groundwater analysis if the residential lots are <br />proposed to be served by wells; <br />(c) public watea supply availability if the residential lots are proposed to be <br />served by a public water system. <br />The notification shall advise the applicant that the applicant will not be considered to <br />have acted in good faith if the applicant proceeds, after the notification, with an <br />application while the amendments are under consideration. <br />An application that has received special use permit approval, preliminary plan <br />approval or that has been scheduled for Boazd of Commissioner preliminary plan <br />actions, will not be so notified and may proceed according to its special use permit or <br />preliminary play approval and'the Orange County Zoning Ordinance and Subdivision <br />Regulations in effect on the date of approval. <br />Begin the notification process as soon as possible. <br />s Only one residential subdivision that has not received either a special use permit or preliminary <br />plan approval would likely qualify for consideration by the Board of Commissioners under the <br />zoning and subdivision rules in place now. That subdivision is Eno Ridge which is scheduled for <br />Board consideration on September 17, 2002. <br />
The URL can be used to link to this page
Your browser does not support the video tag.