Browse
Search
Agenda - 11-25-2002-c1ae_c2b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-25-2002
>
Agenda - 11-25-2002-c1ae_c2b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:30:48 PM
Creation date
8/29/2008 11:13:45 AM
Metadata
Fields
Template:
BOCC
Date
11/25/2002
Document Type
Agenda
Agenda Item
c1ae_c2b
Document Relationships
Minutes - 20021125
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~.a>,.L,'~.Ai:iCiiCnSl it\1,3\1.Ua,datcSil,1U~\:cul•.wtii\caluliUt~tai+:aucrmic•atia,:.f:a:au: r~L Ua:~r.,Esau;,:nsusaauaavvue.;r~u•..o;>+.un:,:, . <br />01~ <br />event adjustments or substitutions are needed <br />until the mitigation area is established; and <br />~ A financial guarantee is required for the total <br />cost of the mitigation project. Once the <br />installation is complete, thirty percent (30%) of <br />the amount of the letter of credit or escrow will. <br />be held for twelve (12) months or until the site is <br />established, whichever is greater. <br />~ Drainage <br />1) All drainage structures will be installed and <br />maintained according to the approved <br />Stormwater Management Plan. <br />2) Subdivisions that include retention/detention <br />ponds shall comply with the requirements in <br />Section 6.23.4, Operation and Maintenance of <br />Structural Best Management Practices. <br />h) Grading and Erosion Control <br />1) Plans for grading and erosion control comply <br />with standards contained in the Orange County <br />Erosion and Sediment Control Ordinance and <br />Manual; <br />2) Construction is phased to the extent practical to <br />minimize disturbance and sedimentation; <br />3) Sediment control measures will be properly <br />installed to filter sediment from runoff during <br />construction and maintained until grading is <br />complete and a permanent vegetative cover has <br />been established and all slopes stabilized; and <br />4) Permanent landscaping, groundcover, mulch, <br />etc. will be installed as soon as practical after <br />construction activities for each phase are <br />completed. <br />i) , Solid Waste Management .• <br />The Solid Waste Management Plan submitted as part of <br />the Resources Management Plan shall include the <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.