Orange County NC Website
<br />D~ euelop construction drawings and bids, gain Town site plan approval, <br />award bid to contractor(s) and construct the park facilities according to the <br />BOCC-adopted plan. <br />Estimated Cost $838,500 <br />Construction Project Commissioner Halkiotis <br />Team Commissioner Jacobs <br />County Manager (or designee) <br />Recreation and Parks Management Director <br />Purchasing Director <br />Open Space Design Specialist <br />County Engineer <br />ERC Director <br />Planning Director <br />Park Services Director <br />(Town staff if Joint Master Plan process) <br />BOCC Review of Construction Drawin s Au ust-October 2004 <br />BOCC Bid`A royal <br />"Best-case" Construction Be ins November 2004 <br />December 2004 <br />"Best-Case" Park Opening: _ November 2005 <br />~tction //eeclecl to ~roceec~at this time: <br />If the Board is ready to proceed with planning for this park: <br />1. BOCC representatives to meet with like contingent from Hillsborough <br />Board to discuss joint park, Master Plan opportunities, and scope of <br />project <br />2. Once key decisions made, the two Boards might develop and adopt a <br />pre-concept plan and scope of work <br />3. Appoint Fairview Park Concept Plan (or Fairview Campus Master Plan) <br />Committee, with charge and mission based on pre-concept plan and any <br />operating principles the Board wishes to apply. <br />