<br />Project Name: Fairview Park <br />Project Cost: 850 000 <br />Pre-Concept Plan Completed? IVo <br />Project Status: Existing playground and playing field. Decisions needed on 1) <br />whether park will include both County and Town of Hillsborough portions or <br />County only, 2) whether a joint County/Town park or a County park, and 3) <br />whether park plan will be folded info master plan for other public facilities at site. <br />Funds from 2001 bond, appropriated accordingly in 2002-2012 CIP, consistent <br />with following timetable. There is no pre-concept plan (a 1986 concept plan was <br />prepared). Meeting being scheduled between County and Town representatives <br />to discuss issues. <br />Scope of Work: Discuss outstanding issues with Town of Hillsborough. Develop <br />pre-concept plan. Form concept plan committee to design park and any overall <br />facility, using pre-concept plan and operating principles adopted as part of the <br />char e b the Board of Co <br /> <br />Estimated Cost mmissioners. <br />• <br />$11,500 for detailed to o ra hic and location surve <br />Project Partners? Town of Hillsborough <br />Fairview Park Commissioner Jacobs <br />Concept Plan Committee Commissioner Halkiotis <br />Membership Hillsborough Town Commissioners <br /> 1 OC Recreation and Parks Advisory Council member <br /> 1 Hillsborough Parks and Recreation Board member <br /> 1 Commission for the Environment member <br /> Area Citizens <br /> _ <br />1 citizen design professional/ other expertise <br /> Additional members if a Master Plan Work Grou ? <br />Staff Resources Primary: County Manager (or designee), Open Space <br /> Design Specialist, ERC Director, Recreation and <br /> Parks Management Director, Town Manager (or <br /> designee) <br /> Other (Primary, if Master Plan approach selected): <br /> Land Conservation Manager, County Engineer, <br /> Planning Director (County and Town), Purchasing <br /> Director, Public Works Director <br /> 2003 <br />Town/County Work Group (Process): December 2002 - February <br />BOCC Approval of Scope of Project: March-June 2003 <br />Projected Concept Plan Timetable*: July 2003 -April 2004 <br />Target Date BOCC/Town Consideration*: May-Auqust 2004 <br />* - As per current proposed schedule. <br />