Browse
Search
Agenda - 11-21-2002-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-21-2002
>
Agenda - 11-21-2002-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:39:10 PM
Creation date
8/29/2008 11:13:38 AM
Metadata
Fields
Template:
BOCC
Date
11/21/2002
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20021121
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />1 must be documented and justified in writing and submitted with <br />the monthly report to the Division of Water Resources. <br />Subsequent conservation and reduced Eno River withdrawal may be <br />required to mitigate lost water reserves. <br />4. County shall have the following specific <br />responsibilities in addition to those stated or implied in Table <br />1: <br />a) Coordinating the withdrawal, release and retention <br />of water at Lake Orange, Corporation Lake, Lake <br />Ben Johnston, and Piedmont Minerals to achieve the <br />water management plan requirements and to insure <br />the in-stream flow required by Table 1; <br />b) Informing the water withdrawers of the Lake Orange <br />level and the Hillsborough gauge reading when Lake <br />Orange is less than full; <br />c) Informing the Division of Water Resources when any <br />problems are occurring in achieving in-stream flow <br />or meeting withrawal limitations; <br />d) Accurately reading the USGS gauge at Hillsborough; <br />e) Maintaining and operating the retention and <br />release of water at Lake Orange. Maintenance and <br />operation shall include, but is not limited to: <br />i) legible scales <br />-- ii) clear functioning gates <br />iii) effective operation of valves and gates <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.