Browse
Search
Agenda - 11-19-2002-5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-19-2002
>
Agenda - 11-19-2002-5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:53:12 PM
Creation date
8/29/2008 11:13:16 AM
Metadata
Fields
Template:
BOCC
Date
11/19/2002
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20021119
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
Rate Order Time Warner Cable
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2000 - 2009\2002
Tolling and Accounting Order Time Warner Cable
(Linked From)
Path:
\Board of County Commissioners\Various Documents\2000 - 2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~D <br />STATE OF NORTH CAROLINA <br />ORANGE COUNTY <br />Tolling and Accounting Order to <br />IN THE MATTER OF: ) Extend the Review Period for <br />Regulated Cable Service Provided by Time ) Time Warner Cable's 2003 <br />Warner Cable to its Orange County Cable ) FCC-1240, 1205, 1235 Rate Filing <br />Television Subscribers, NC-0256 & 0276 ) 'Through January 2003 <br />BEFORE THE BOARD OF COUNTY COMMISSIONERS: <br />WHEREAS, on October 1, 2002, Time Warner Cable submitted an FCC-1240 Updating Maximum <br />Permitted Rates filing, FCC-1205 Determining Regulated Equipment and Installation costs, and FCC-1235 cost of <br />Service Filing for Cable Network Upgrades for Regulated Cable Service with the County, Time Warner Cable's <br />filing includes actual and estimated costs it may incur during the projected period January -December 2003, along <br />with previous expenses from the "true up" period October 2001-September 31, 2002; <br />WHEREAS, the Federal Communications Commission has promulgated rate filing procedures that allow <br />cable operators to estimate future external costs, and costs associated with system upgrades, and recover those <br />projected costs utilizing the FCC-1240 filing process, performed annually; <br />WHEREAS, the County is certified with the FCC to regulate basic cable service, equipment and <br />installation rates and services within the County; and <br />WHEREAS, the FCC §76.933 grants franchise authorities the ability to toll the time in which to review <br />rate filings submitted by cable operators, extending the period of review from the initia130 days, to an additiona190 <br />days (120 days total) past the original date of receipt by the franchise authority. <br />IT IS THEREFORE ORDERED: <br />THAT the time period in which the County has to review Time Warner Cable's FCC-1240 rate filing is <br />tolled 90 days past the origina130 days (120 days total) allowed by the FCC, extending the total review period <br />deadline; and <br />THAT Time Warner Cable is directed to maintain a complete and accurate accounting of all costs and <br />revenues associated with the aforementioned filing. <br />ISSUED BY ORDER OF THE BOARD OF COUNTY COMMISSIONERS: <br />This the _ day of 2002. <br />BY: <br />Mayor <br />ATTEST: <br />Clerk <br />Deliver via Certified U.S. Mail to: Paul Baccellieri, Vice President-Finance; Time Warner Cable, Raleigh-Durham Division <br />File copy to: Robert F. Sepe, Action Audits, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.