Browse
Search
Agenda - 11-11-2002-5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:42:58 AM
Creation date
8/29/2008 11:13:07 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Memorandum <br />To. County Commissioners <br />From: Pam Jones. Director of Purchasing antl Central Services <br />RE: Construction Management br County-FUntletl Projects <br />Date'. June 4, 2002 <br />The Boats has previously requestetl that information regaNing wnatmction management <br />options for County-fundetl projects be provided. The attachetl information is provitletl so <br />that it may be consitlered in the mntext of projects being consitleretl as part of the 2002- <br />2012 Capital Investment Plan. <br />The attachetl packet of information includes the following information fir wnsitleretion <br />tluring the butlget work session an June 11, 2002 <br />1. The list of potential tasks fora construction manager <br />2. Apoten[ial selection process fora construction manager <br />3. June 30, 1999 meeting documents: (Proposetl a contract with PES, a consulting <br />him, to VE 2 schools, Smith Middle antl Pathways Elementary) <br />a. The abstract, which inGudes a Scepe of Work statement from PES, the <br />recommandetl value engineering firm; and <br />b. Minutes <br />i. Note: BOCC action wes ro nct endorse the PES contract that would <br />have provided value engineering to Smith Mitltlle School antl <br />Pathways Elementary Schools. The rest was $39,295 per school; <br />antl <br />ii. To pursue"phase two'of value engineering (the result was CEFI) <br />4. December ~, 1999 meeting documents: (Cost Eficient Facilities Indiatives (CEFI) <br />report wes given at This meeting. <br />s. The abstract, which inclutlatl the CEFI report <br />b. Minutes <br />I. Note: The BOCG approvetl the CEFI concept and instructed the that <br />this discussion should be heltl with the Schaal BoaNa s[[he Joint <br />meeting on December 13, 1999. <br />5. December 13, 1999 Join[ BOCCISChool Boartl meeting (CEFI tliscussetl) <br />s. Minutes <br />I. Note: No reference to decisions by me BpaM <br />
The URL can be used to link to this page
Your browser does not support the video tag.