Browse
Search
Agenda - 11-11-2002-5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:42:58 AM
Creation date
8/29/2008 11:13:07 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Document Type
Agenda
Agenda Item
5
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Cort Efficient Faeilitlea tnitiarivev (CEFl) <br />fsr COmty antl <br />svhwl Gpilal l'ro)eGe <br />December ],1999 <br />A work group involving two County Commissioners, the County Manager <br />antl several County staff members met several times over the past month <br />In an effort to Itlentiry cost efficiency initiatives in the development of <br />Couny and School facilities. The ensuing report In meant to reflect the <br />essence of these tliscusslons as well as to provitle a point of departure for <br />tlialogue among the Board of Commissioners antl School Boartl members. <br />Why Initiate Cost ERcient Facilifies Inifiafivas (CEFI) Now9 <br />Accoming to the Orange County Planning Oirecter, protections of school mnatme[ion <br />needs indicate that approximately 19 schools will be required to meet the student <br />population needs over the nex[30 years. Basetl on cons[motion estimates fromthe school <br />construction stantlartls ,the present value tlollars nestled to support mnstmclion for these <br />educalbnal facildies is estimated to be $339.483,685. <br />The following table reflec[Ing the projection of school neetls is based on the assumption <br />that growth will wnlinua at a wnstant enrollment increase each year (i.e. Orange County <br />School DisVict at 150 new students per year and Chapel HiIllCarrbore at 300 new students <br />per year. As further develepment of [he School Atlequate Public Facilities Ordinance <br />(SAPFO) wntinues, a further analysis of existing capacity as well as proposetl capacity <br />will be conducletl.) <br />Orange County System ChapeE1ri11 Carrboro syarcm <br />• Elementary: Elementary: <br />4x $12,]85,4&5e$51,141,949 ]x$12,]85,485=$89,498,395 <br />• Mltltlle: M/tltlle: <br />2 x 18,SW,fi]0=$3],909,349 3x 18,594,fi]0=$55,514,019 <br />• Hlgh School: High School: <br /> 1000 student capacity <br />• 1500 sNdeM capacity: 1 x $24,]09,009 = §24,]99,000 <br />1 x$40800,000=$40,800,000 <br /> • 1500 sWtlent capacity. <br /> 1 x $40,800,000= §40,800,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.