Browse
Search
Agenda - 11-11-2002-4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 11-11-2002
>
Agenda - 11-11-2002-4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:44:49 AM
Creation date
8/29/2008 11:13:06 AM
Metadata
Fields
Template:
BOCC
Date
11/11/2002
Document Type
Agenda
Agenda Item
4
Document Relationships
Minutes - 20021111
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cddcal space nestle for Mesa Mrea areas is necessary. This being the case, nc expansion for <br />GSC wpukl be contempla[etl in the early phases cf the space sNtly. <br />J tl F 'I' E I <br />The planning pracesa WrJustke facilifes expansion was schetluletl to begin around July 1, 2002. <br />However, ae the BoaN will recall, the planning proceae was delayetl by au-months due to butlgerary <br />consfminta for FV Z(102-2003. qs presen[etl in material during the BoaN's bWgat work session on <br />June t t, 2W2, the revisetl Nmeline would be ea follows: <br />• The eppoiMmenta to the mree planning groups esfeblishetl by the planning process adoptetl by the <br />Board on September A,2001 wqu10 be matle in January 2003. <br />• The architect aeledion process woultl be completed antl rerommentletion of ibe group presented for <br />BoeN censitleratipn no later then June 30, 2003, thereby requiring no dealgn funtls during the 2002- <br />2003fiscalyeer. <br />• Commencement of consfruilign of Me fecilbies is anticipetetl in FY 2005-2008, wtlh completion <br />approximately 15-00 months MereaNer (FV 2008-2009). <br />In prtler to ensure clear untlemtantling of the rerioua planning groups e99DOlefetl with this project, the <br />BoaN may wish to provide Wither tlireillon antl comments In fhe folbwing areas: <br />Size of me addition: <br />• The master plan reMaetl fhe phases of rustics facilky eryanelon from four b three; and increasetl <br />each phase from 26,000 S. F. [0 2],000 S.F. This would allow a total expansion on the site of 81,000 <br />SF. However ee noted below, surface paging on fhe tlpwntown campus will axanmbtlete only <br />two phases of the expenaion fora [ctal of approsimetely 56,000 BF. Please note Mat atltlitipnal <br />detention space Is not ccn[emplatetl ea petl of the justice facility expenaon. <br />Phase I, whit Inclutles one approximetey 2],000 square foot etltlifion, is plannetl for coneVUCtion at <br />this Gme. <br />Parking <br />• Phase I inclutles undergrountl paMmg of approximately 0,000 square feet, wMM will be used as <br />secure parking for toad officials antl a way to safely bring Inmates info Ne building. <br />All other panting asemiatetl witM1 Mla edtlltlon will be sudaca perking. <br />Programming <br />• It Is important to note [nor the pmgramming phase of this projeM ofleM ccmplete flexibility in such <br />things ee how fhe builtling will be mnfigureq where Mtllvitlual luncrigns ere eimetetl within the <br />builtling, how space will he accessed, anterior areas for drop oft of dlenta, tleliyedes etc. Functional <br />preferences are normally tliacussetl at fhe first meeting with an arohi[eMU21 firm eXer a contrail has <br />been approved antl they are reatly to cwnmence work. Howevaq it is importam to untlersrantl antl <br />agree to Me specilic functions Nat wcultl be inclutletl In a builtling. <br />The Meater Plan presentetl In March 2000 provided <br />o Erpantle0 support apace for the Clerk Of Coqd, thereby allowing con0olitlatiw Of all <br />Clerk's gMCe operaGOns back t0 the CcurMOUSe; and <br />o Security vesObule, whereby a single point M entry could be establiahetl. <br />o Space in wfiich b relocate the SheriX's CeDadment. <br />o The balance M the apace was t0 be ellocatetl by the County tq other turmuons currently <br />loratetl In fhe Courthouse, whkh, as space albws mull Inclutle fhe fdlowing: <br />gtldiYOnel orcice space for fhe Ciatllcf gtlorney; <br />CoudrocMmeeOng/metllation space <br />
The URL can be used to link to this page
Your browser does not support the video tag.